A constraint programming model for the scheduling of JIT cross-docking systems with preemption

In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply c...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Journal of intelligent manufacturing Ročník 27; číslo 2; s. 297 - 313
Hlavní autori: Fazel Zarandi, M. H., Khorshidian, H., Akbarpour Shirazi, M.
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: New York Springer US 01.04.2016
Springer Nature B.V
Predmet:
ISSN:0956-5515, 1572-8145
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply chain management. A new multi-criteria model, with non-linear terms and integer variables, which cannot be solved efficiently for large sized problems, is proposed. This paper also shows how to map a JIT cross-dock model to a constraint satisfaction problem (CSP) and integer programming (IP). To solve the model for real size applications, a genetic algorithm (GA) is applied. Finally, a computational experiment is carried out to analyze the performances of CSP, GA and IP models with respect to modeling capability, solution quality and time.
Bibliografia:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0956-5515
1572-8145
DOI:10.1007/s10845-013-0860-9