A constraint programming model for the scheduling of JIT cross-docking systems with preemption
In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply c...
Uloženo v:
| Vydáno v: | Journal of intelligent manufacturing Ročník 27; číslo 2; s. 297 - 313 |
|---|---|
| Hlavní autoři: | , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
New York
Springer US
01.04.2016
Springer Nature B.V |
| Témata: | |
| ISSN: | 0956-5515, 1572-8145 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply chain management. A new multi-criteria model, with non-linear terms and integer variables, which cannot be solved efficiently for large sized problems, is proposed. This paper also shows how to map a JIT cross-dock model to a constraint satisfaction problem (CSP) and integer programming (IP). To solve the model for real size applications, a genetic algorithm (GA) is applied. Finally, a computational experiment is carried out to analyze the performances of CSP, GA and IP models with respect to modeling capability, solution quality and time. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 0956-5515 1572-8145 |
| DOI: | 10.1007/s10845-013-0860-9 |