A constraint programming model for the scheduling of JIT cross-docking systems with preemption

In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply c...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Journal of intelligent manufacturing Ročník 27; číslo 2; s. 297 - 313
Hlavní autoři: Fazel Zarandi, M. H., Khorshidian, H., Akbarpour Shirazi, M.
Médium: Journal Article
Jazyk:angličtina
Vydáno: New York Springer US 01.04.2016
Springer Nature B.V
Témata:
ISSN:0956-5515, 1572-8145
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. This problem, which is known to be NP-hard, is compatible with the concepts of just-in-time (JIT) production and supply chain management. A new multi-criteria model, with non-linear terms and integer variables, which cannot be solved efficiently for large sized problems, is proposed. This paper also shows how to map a JIT cross-dock model to a constraint satisfaction problem (CSP) and integer programming (IP). To solve the model for real size applications, a genetic algorithm (GA) is applied. Finally, a computational experiment is carried out to analyze the performances of CSP, GA and IP models with respect to modeling capability, solution quality and time.
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0956-5515
1572-8145
DOI:10.1007/s10845-013-0860-9