A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs

Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm bas...

Full description

Saved in:
Bibliographic Details
Published in:International journal of production economics Vol. 101; no. 1; pp. 19 - 29
Main Authors: Ohta, Hiroshi, Nakatani, Toshihiro
Format: Journal Article
Language:English
Published: Amsterdam Elsevier B.V 01.05.2006
Elsevier
Elsevier Sequoia S.A
Series:International Journal of Production Economics
Subjects:
ISSN:0925-5273, 1873-7579
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. Several benchmark problems which are commonly used for job-shop scheduling problems of minimizing the makespan are solved by the proposed method and the results are reported.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0925-5273
1873-7579
DOI:10.1016/j.ijpe.2005.05.004