An FPTAS for the parallel two-stage flowshop problem
We consider the NP-hard m-parallel two-stage flowshop problem, abbreviated as the (m,2)-PFS problem, where we need to schedule n jobs to m parallel identical two-stage flowshops in order to minimize the makespan, i.e. the maximum completion time of all the jobs on the m flowshops. The (m,2)-PFS prob...
Uložené v:
| Vydané v: | Theoretical computer science Ročník 657; s. 64 - 72 |
|---|---|
| Hlavní autori: | , , , , , , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Elsevier B.V
02.01.2017
|
| Predmet: | |
| ISSN: | 0304-3975, 1879-2294 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!