Chance constrained programming based optimal network reconfiguration in smart grid

The network reconfiguration during power system restoration after blackouts usually takes a long and complex procedure. To address the uncertainties in the restoration steps and time involved, a CCP (Chance Constrained Programming) based method for network reconfiguration scheme optimization is prop...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:IEEE International Conference on Industrial Informatics (INDIN) s. 656 - 662
Hlavní autori: Zeng, Shunqi, Xu, Zhao, Wen, Fushuan, Lai, Loi Lei
Médium: Konferenčný príspevok..
Jazyk:English
Vydavateľské údaje: IEEE 01.07.2016
Predmet:
ISSN:2378-363X
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:The network reconfiguration during power system restoration after blackouts usually takes a long and complex procedure. To address the uncertainties in the restoration steps and time involved, a CCP (Chance Constrained Programming) based method for network reconfiguration scheme optimization is proposed in this paper. The proposed method can generate the best restoration sequence to maximize the benefit of the reconfiguration scheme by taking into account the number of restarted generator-nodes and the cost of power outage saved by the load restoration accordingly. The Differential Evolution (DE) is employed to solve for the optimal solution subject to special requirements of the network reconfiguration operation. A numerical example over the New England 39-bus power system is conducted to demonstrate the effectiveness of the proposed method.
ISSN:2378-363X
DOI:10.1109/INDIN.2016.7819242