A Priority-based Dynamic Chain Operation Planning Model
Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Schedulin...
Saved in:
| Published in: | International Conference on Dependable Systems and Their Applications (Online) pp. 356 - 359 |
|---|---|
| Main Authors: | , |
| Format: | Conference Proceeding |
| Language: | English |
| Published: |
IEEE
10.08.2023
|
| Subjects: | |
| ISSN: | 2767-6684 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Scheduling based on priority is realized by aggregating multiple tasks into task chains. A greedy algorithm is constructed to solve the model and verify its rationality. |
|---|---|
| ISSN: | 2767-6684 |
| DOI: | 10.1109/DSA59317.2023.00050 |