A Priority-based Dynamic Chain Operation Planning Model

Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Schedulin...

Full description

Saved in:
Bibliographic Details
Published in:International Conference on Dependable Systems and Their Applications (Online) pp. 356 - 359
Main Authors: Liu, Yihong, Chen, Xingjun
Format: Conference Proceeding
Language:English
Published: IEEE 10.08.2023
Subjects:
ISSN:2767-6684
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Scheduling based on priority is realized by aggregating multiple tasks into task chains. A greedy algorithm is constructed to solve the model and verify its rationality.
ISSN:2767-6684
DOI:10.1109/DSA59317.2023.00050