Optimization models for the tool change scheduling problem
Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals wi...
Uloženo v:
| Vydáno v: | Omega (Oxford) Ročník 36; číslo 5; s. 888 - 894 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Exeter
Elsevier Ltd
01.10.2008
Elsevier Elsevier Science Publishers Pergamon Press Inc |
| Edice: | Omega |
| Témata: | |
| ISSN: | 0305-0483, 1873-5274 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is
T
L
(tool life) and the tool change time is
T
C
. Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models’ efficiency. |
|---|---|
| Bibliografie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| ISSN: | 0305-0483 1873-5274 |
| DOI: | 10.1016/j.omega.2006.04.006 |