Optimization models for the tool change scheduling problem

Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals wi...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Omega (Oxford) Ročník 36; číslo 5; s. 888 - 894
Hlavní autor: Chen, Jen-Shiang
Médium: Journal Article
Jazyk:angličtina
Vydáno: Exeter Elsevier Ltd 01.10.2008
Elsevier
Elsevier Science Publishers
Pergamon Press Inc
Edice:Omega
Témata:
ISSN:0305-0483, 1873-5274
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is T L (tool life) and the tool change time is T C . Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models’ efficiency.
Bibliografie:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0305-0483
1873-5274
DOI:10.1016/j.omega.2006.04.006