Multiobjective multistage distribution system planning using tabu search
This study presents a multiobjective tabu search algorithm to solve the multistage planning problem of a distribution system formulated as a multiobjective dynamic mixed integer non-linear programming problem. Multiobjective problems do not have a specific solution, but a set of solutions that allow...
Uložené v:
| Vydané v: | IET generation, transmission & distribution Ročník 8; číslo 1; s. 35 - 45 |
|---|---|
| Hlavní autori: | , , , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Stevenage
The Institution of Engineering and Technology
01.01.2014
Institution of Engineering and Technology The Institution of Engineering & Technology |
| Predmet: | |
| ISSN: | 1751-8687, 1751-8695 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Shrnutí: | This study presents a multiobjective tabu search algorithm to solve the multistage planning problem of a distribution system formulated as a multiobjective dynamic mixed integer non-linear programming problem. Multiobjective problems do not have a specific solution, but a set of solutions that allows us to observe the trade-off among the analysed objectives. Taking into account this concept, the objective functions of the model proposed in this study are: costs (investment and operational) and reliability. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalising switches and construction of tie lines. The system's reliability is evaluated by means of the non-supplied energy under contingencies using the n − 1 criterion. By line switching and the use of tie lines, part of the loads affected by a contingency can be restored, thus, the non-supplied energy can be evaluated by solving a distribution network restoration problem. Numerical results are presented for a 54-bus system. |
|---|---|
| Bibliografia: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-1 ObjectType-Feature-2 content type line 23 |
| ISSN: | 1751-8687 1751-8695 |
| DOI: | 10.1049/iet-gtd.2013.0115 |