Maximizing the Effectiveness of a Preventive Maintenance System: An Adaptive Modeling Approach

The dynamic nature of an operating environment, such as machine utilization and breakdown frequency results in changing preventive maintenance (PM) needs for manufacturing equipment. In this paper, we present an approach to generate an adaptive PM schedule which maximizes the net savings from PM sub...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Management science Jg. 43; H. 6; S. 827 - 840
Hauptverfasser: Gopalakrishnan, Mohan, Ahire, Sanjay L, Miller, David M
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Hanover, MD., etc INFORMS 01.06.1997
Institute for Operations Research and the Management Sciences
Schriftenreihe:Management Science
Schlagworte:
ISSN:0025-1909, 1526-5501
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The dynamic nature of an operating environment, such as machine utilization and breakdown frequency results in changing preventive maintenance (PM) needs for manufacturing equipment. In this paper, we present an approach to generate an adaptive PM schedule which maximizes the net savings from PM subject to workforce constraints. The approach consists of two components: (a) task prioritization based on a multi-logit regression model for each type of PM task, and (b) task rescheduling based on a binary integer programming (BIP) model with constraints on single-skilled and multi-skilled workforce availability. The task prioritization component develops a multi-logit regression for machine failure probability associated with each type of PM task at the beginning of the year, using historical data on machine utilization, PM, and machine breakdowns. At the start of each PM time-bucket (e.g., a month), we use the updated machine failure probability for each candidate PM task to compute its current contribution to net PM savings, which indicates its current priority. The task rescheduling BIP model incorporates the priorities in selecting tasks for the current bucket to maximize PM effectiveness subject to workforce availability, yielding an adaptive and effective PM schedule for each time-bucket of the master PM schedule. We examine the effect of using multi-skilled workforce on the overall PM effectiveness, and also provide an illustration from a newspaper publishing environment to explain the use of the approach. We have developed four heuristic algorithms to yield good solutions to large scale versions of this scheduling problem. The heuristics perform extremely well, and the best heuristic solution is within 1.4% of optimality on an average.
Bibliographie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ObjectType-Article-2
ObjectType-Feature-1
content type line 23
ISSN:0025-1909
1526-5501
DOI:10.1287/mnsc.43.6.827