“Product Partition” and related problems of scheduling and systems reliability: Computational complexity and approximation
Problem Product Partition differs from the NP-complete problem Partition in that the addition operation is replaced by the multiplication operation. Furthermore it differs from the NP-complete problem Subset Product in that it does not contain the product value B in its input. We prove that problem...
Uloženo v:
| Vydáno v: | European journal of operational research Ročník 207; číslo 2; s. 601 - 604 |
|---|---|
| Hlavní autoři: | , , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Amsterdam
Elsevier B.V
01.12.2010
Elsevier Elsevier Sequoia S.A |
| Edice: | European Journal of Operational Research |
| Témata: | |
| ISSN: | 0377-2217, 1872-6860 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | Problem Product Partition differs from the NP-complete problem Partition in that the addition operation is replaced by the multiplication operation. Furthermore it differs from the NP-complete problem Subset Product in that it does not contain the product value
B in its input. We prove that problem Product Partition and several of its modifications are NP-complete in the strong sense. Our results imply the strong NP-hardness of a number of scheduling problems with start-time-dependent job processing times and a problem of designing a reliable system with a series–parallel structure. It should be noticed that the strong NP-hardness of the considered optimization problems does not preclude the existence of a fully polynomial time approximation scheme (FPTAS) for them. We present a simple FPTAS for one of these problems. |
|---|---|
| Bibliografie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-2 content type line 23 |
| ISSN: | 0377-2217 1872-6860 |
| DOI: | 10.1016/j.ejor.2010.05.034 |