An NSGA-II based multi-objective optimization for combined gas and electricity network expansion planning

•Developed a multi-objective model for the combined natural gas network and electricity network.•Taken into account the uncertainty and correlations of wind power in the proposed model.•Presented an improved point-estimation method to solve the combined optimal power and natural gas load flow. With...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Applied energy Ročník 167; s. 280 - 293
Hlavní autoři: Hu, Yuan, Bie, Zhaohong, Ding, Tao, Lin, Yanling
Médium: Journal Article
Jazyk:angličtina
Vydáno: Elsevier Ltd 01.04.2016
Témata:
ISSN:0306-2619, 1872-9118
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:•Developed a multi-objective model for the combined natural gas network and electricity network.•Taken into account the uncertainty and correlations of wind power in the proposed model.•Presented an improved point-estimation method to solve the combined optimal power and natural gas load flow. With the increasing proportion of natural gas in power generation, natural gas network and electricity network are closely coupled. Therefore, planning of any individual system regardless of such interdependence will increase the total cost of the whole combined systems. Therefore, a multi-objective optimization model for the combined gas and electricity network planning is presented in this work. To be specific, the objectives of the proposed model are to minimize both investment cost and production cost of the combined system while taking into account the N−1 network security criterion. Moreover, the stochastic nature of wind power generation is addressed in the proposed model. Consequently, it leads to a mixed integer non-linear, multi-objective, stochastic programming problem. To solve this complex model, the Elitist Non-dominated Sorting Genetic Algorithm II (NSGA-II) is employed to capture the optimal Pareto front, wherein the Primal–Dual Interior-Point (PDIP) method combined with the point-estimate method is adopted to evaluate the objective functions. In addition, decision makers can use a fuzzy decision making approach based on their preference to select the final optimal solution from the optimal Pareto front. The effectiveness of the proposed model and method are validated on a modified IEEE 24-bus electricity network integrated with a 15-node natural gas system as well as a real-world system of Hainan province.