Yin, Y., Wang, D., Wu, C., & Cheng, T. (2016). CON/SLK due date assignment and scheduling on a single machine with two agents. Naval research logistics, 63(5), 416-429. https://doi.org/10.1002/nav.21700
Chicago-Zitierstil (17. Ausg.)Yin, Yunqiang, Du-Juan Wang, Chin-Chia Wu, und T.C.E Cheng. "CON/SLK Due Date Assignment and Scheduling on a Single Machine with Two Agents." Naval Research Logistics 63, no. 5 (2016): 416-429. https://doi.org/10.1002/nav.21700.
MLA-Zitierstil (9. Ausg.)Yin, Yunqiang, et al. "CON/SLK Due Date Assignment and Scheduling on a Single Machine with Two Agents." Naval Research Logistics, vol. 63, no. 5, 2016, pp. 416-429, https://doi.org/10.1002/nav.21700.
Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.