Multi-objective no-wait flowshop scheduling problems: models and algorithms
This article studies multi-objective no-wait flowshop scheduling problems to minimise both makespan and total tardiness. This problem is commonly denoted by . This article mathematically formulates the problem using two effective multi-objective mixed integer linear programming models. The multi-obj...
Gespeichert in:
| Veröffentlicht in: | International journal of production research Jg. 50; H. 10; S. 2592 - 2608 |
|---|---|
| Hauptverfasser: | , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Abingdon
Taylor & Francis Group
15.05.2012
Taylor & Francis Taylor & Francis LLC |
| Schlagworte: | |
| ISSN: | 0020-7543, 1366-588X |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | This article studies multi-objective no-wait flowshop scheduling problems to minimise both makespan and total tardiness. This problem is commonly denoted by
. This article mathematically formulates the problem using two effective multi-objective mixed integer linear programming models. The multi-objective mathematical models are then solved by a multiple criteria decision making approach, called Fuzzy programming method. Moreover, the article proposes a novel multi-objective iterated local search algorithm incorporating three types of local search engine: greedy, moderate and curtailed fashions. The algorithm is carefully evaluated for its performance against two available algorithms by means of multi-objective performance measures and statistical tools. The results show that the proposed solution method outperforms the others. |
|---|---|
| Bibliographie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-2 content type line 23 |
| ISSN: | 0020-7543 1366-588X |
| DOI: | 10.1080/00207543.2010.543937 |