A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer

This work deals with a scheduling problem of a real-world production process in the metal–working industry. The production process can be described as an offline stochastic flexible flow-shop problem with limited buffers. In a first step, we analyze a simplified model and develop a variable neighbor...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics Jg. 145; H. 1; S. 88 - 95
Hauptverfasser: Almeder, Christian, Hartl, Richard F.
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Amsterdam Elsevier B.V 01.09.2013
Elsevier Sequoia S.A
Schlagworte:
ISSN:0925-5273, 1873-7579
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This work deals with a scheduling problem of a real-world production process in the metal–working industry. The production process can be described as an offline stochastic flexible flow-shop problem with limited buffers. In a first step, we analyze a simplified model and develop a variable neighborhood search based solution approach where we use multiple scenarios to evaluate the objective. Second, the solution approach is adapted to a real-world case using a detailed discrete-event simulation to evaluate the production plans. We are able to improve state-of-the-art production plans statistically significant by 3–10%.
Bibliographie:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0925-5273
1873-7579
DOI:10.1016/j.ijpe.2012.09.014