A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs
Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm bas...
Gespeichert in:
| Veröffentlicht in: | International journal of production economics Jg. 101; H. 1; S. 19 - 29 |
|---|---|
| Hauptverfasser: | , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Amsterdam
Elsevier B.V
01.05.2006
Elsevier Elsevier Sequoia S.A |
| Schriftenreihe: | International Journal of Production Economics |
| Schlagworte: | |
| ISSN: | 0925-5273, 1873-7579 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Abstract | Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. Several benchmark problems which are commonly used for job-shop scheduling problems of minimizing the makespan are solved by the proposed method and the results are reported. |
|---|---|
| AbstractList | Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. Several benchmark problems which are commonly used for job-shop scheduling problems of minimizing the makespan are solved by the proposed method and the results are reported. Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop scheduling problem of minimizing the total holding cost of completed and in-process products subject to no tardy jobs. A heuristic algorithm based on the shifting bottleneck procedure is proposed for solving the minimum total holding cost problem subject to no tardy jobs. Several benchmark problems which are commonly used for job-shop scheduling problems of minimizing the makespan are solved by the proposed method and the results are reported. [PUBLICATION ABSTRACT] |
| Author | Ohta, Hiroshi Nakatani, Toshihiro |
| Author_xml | – sequence: 1 givenname: Hiroshi surname: Ohta fullname: Ohta, Hiroshi email: ohta@ie.osakafu-u.ac.jp – sequence: 2 givenname: Toshihiro surname: Nakatani fullname: Nakatani, Toshihiro |
| BackLink | http://econpapers.repec.org/article/eeeproeco/v_3a101_3ay_3a2006_3ai_3a1_3ap_3a19-29.htm$$DView record in RePEc |
| BookMark | eNp9UcFq3DAQFSGFbNL-QE6id29lS15Z0EsIbRoI9JK7kKXZWMaWHEkObD-hX90x2156CMzoDWLem-HNNbkMMQAhtzXb16w-fBn3flxg3zDW7rdg4oLs6k7ySrZSXZIdU01btY3kV-Q655ExJuuu25Hfd3SANflcvKVj7Ks8xIVmO4BbJx9eqJleYvJlmGmJdPbBz_4X0DJgxmImOsTJbX025kLjEXFeJijgqAmO-lAtKVrImSK61ZZM89qPYMumFyItJrnTNjl_JB-OZsrw6S_ekOfv357vf1RPPx8e7--eKisaUSrbH1reN66VhkvBHQBrOTDXK84PjnVGdEqAciCYkKo3qjaAheiVlebI-A35fJbFhV5XyEWPcU0BJ-padUpJ9AabHs9NCRawekl-NumkAQBZYKN-09yg8_ieMNH3A4LfPjGXDZVulB7KjFrdWcummHOCo7a-mOJjKMn4SddMbzfUo95uqLcb6i2YQGrzH_XfJu-Svp5JgCa-eUg6Ww_BgvMJfdcu-vfofwDgrLoh |
| CODEN | IJPCEY |
| CitedBy_id | crossref_primary_10_7763_IJCCE_2013_V2_174 crossref_primary_10_1007_s10951_012_0270_4 crossref_primary_10_1007_s00170_008_1781_1 crossref_primary_10_1016_j_ejor_2018_01_027 crossref_primary_10_1016_j_eswa_2010_08_006 crossref_primary_10_4028_www_scientific_net_AMM_591_176 |
| Cites_doi | 10.1287/opre.40.1.113 10.1287/mnsc.33.8.1035 10.1057/jors.1992.162 10.1016/0377-2217(94)90379-4 10.1287/mnsc.34.3.391 10.1287/mnsc.35.2.164 10.1016/0377-2217(93)90163-H 10.1080/00207549008942866 10.1287/ijoc.3.2.149 10.1016/0925-5273(95)00090-9 |
| ContentType | Journal Article |
| Copyright | 2005 Elsevier B.V. Copyright Elsevier Sequoia S.A. May 2006 |
| Copyright_xml | – notice: 2005 Elsevier B.V. – notice: Copyright Elsevier Sequoia S.A. May 2006 |
| DBID | AAYXX CITATION DKI X2L 7TA 7TB 8FD FR3 JG9 KR7 |
| DOI | 10.1016/j.ijpe.2005.05.004 |
| DatabaseName | CrossRef RePEc IDEAS RePEc Materials Business File Mechanical & Transportation Engineering Abstracts Technology Research Database Engineering Research Database Materials Research Database Civil Engineering Abstracts |
| DatabaseTitle | CrossRef Materials Research Database Civil Engineering Abstracts Engineering Research Database Technology Research Database Mechanical & Transportation Engineering Abstracts Materials Business File |
| DatabaseTitleList | Materials Research Database |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering Business |
| EISSN | 1873-7579 |
| EndPage | 29 |
| ExternalDocumentID | 954623311 eeeproeco_v_3a101_3ay_3a2006_3ai_3a1_3ap_3a19_29_htm 10_1016_j_ijpe_2005_05_004 S0925527305001301 |
| Genre | Feature |
| GroupedDBID | --K --M -~X .DC .~1 0R~ 1B1 1RT 1~. 1~5 29J 4.4 457 4G. 5GY 5VS 7-5 71M 8P~ 9JN 9JO AAAKF AAAKG AABNK AACTN AAEDT AAEDW AAFFL AAIAV AAIKJ AAKOC AALRI AAOAW AAPFB AAQFI AAQXK AARIN AAXUO ABFNM ABFRF ABJNI ABMAC ABUCO ABXDB ABYKQ ACDAQ ACGFO ACGFS ACGOD ACIWK ACNNM ACRLP ACROA ADBBV ADEZE ADFHU ADMUD ADTZH AEBSH AECPX AEFWE AEKER AENEX AEYQN AFKWA AFODL AFTJW AGHFR AGTHC AGUBO AGYEJ AHHHB AHJVU AI. AIEXJ AIIAU AIKHN AITUG AJBFU AJOXV AJWLA ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ APLSM ASPBG AVWKF AXJTR AXLSJ AZFZN BEHZQ BEZPJ BGSCR BJAXD BKOJK BKOMP BLXMC BNTGB BPUDD BULVW BZJEE CS3 DU5 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 FDB FEDTE FGOYB FIRID FNPLU FYGXN G-2 G-Q GBLVA HAMUX HLX HVGLF HZ~ IHE IXIXF J1W JJJVA KOM LG8 LY1 LY7 M41 MO0 MS~ N9A O-L O9- OAUVE OZT P-8 P-9 P2P PC. PQQKQ Q38 R2- RIG ROL RPZ RXW SBM SDF SDG SDP SDS SES SET SEW SPC SPCBC SSB SSD SSF SST SSZ T5K TAE TN5 U5U VH1 WUQ YK3 ~02 ~G- 9DU AATTM AAXKI AAYWO AAYXX ABWVN ACLOT ACRPL ACVFH ADCNI ADNMO ADVLN AEIPS AEUPX AFJKZ AFPUW AGQPQ AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP CITATION EFKBS ~HD 02 0R 1 1AW 8P AAPBV ADALY DKI G- HZ IPNFZ K M MS PQEST TAF X X2L 7TA 7TB 8FD AGCQF FR3 JG9 KR7 |
| ID | FETCH-LOGICAL-c424t-cb653b2d57a3743dee053e0db9336d08a4894e9de40479ba91ae4794b9c7af03 |
| ISICitedReferencesCount | 16 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000234645400003&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 0925-5273 |
| IngestDate | Wed Aug 13 08:58:44 EDT 2025 Wed Aug 18 03:12:48 EDT 2021 Sat Nov 29 01:48:00 EST 2025 Tue Nov 18 21:57:10 EST 2025 Fri Feb 23 02:29:03 EST 2024 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 1 |
| Keywords | Due-date constraints Shifting bottleneck procedure Heuristics Holding cost Job-shop scheduling |
| Language | English |
| License | https://www.elsevier.com/tdm/userlicense/1.0 |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c424t-cb653b2d57a3743dee053e0db9336d08a4894e9de40479ba91ae4794b9c7af03 |
| Notes | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| PQID | 198997000 |
| PQPubID | 45063 |
| PageCount | 11 |
| ParticipantIDs | proquest_journals_198997000 repec_primary_eeeproeco_v_3a101_3ay_3a2006_3ai_3a1_3ap_3a19_29_htm crossref_citationtrail_10_1016_j_ijpe_2005_05_004 crossref_primary_10_1016_j_ijpe_2005_05_004 elsevier_sciencedirect_doi_10_1016_j_ijpe_2005_05_004 |
| PublicationCentury | 2000 |
| PublicationDate | 2006-05-01 |
| PublicationDateYYYYMMDD | 2006-05-01 |
| PublicationDate_xml | – month: 05 year: 2006 text: 2006-05-01 day: 01 |
| PublicationDecade | 2000 |
| PublicationPlace | Amsterdam |
| PublicationPlace_xml | – name: Amsterdam |
| PublicationSeriesTitle | International Journal of Production Economics |
| PublicationTitle | International journal of production economics |
| PublicationYear | 2006 |
| Publisher | Elsevier B.V Elsevier Elsevier Sequoia S.A |
| Publisher_xml | – name: Elsevier B.V – name: Elsevier – name: Elsevier Sequoia S.A |
| References | Van Laarhoven, Aarts, Lenstra (bib11) 1992; 40 Asano, Ohta (bib4) 1996; 44 Anderson, Nyirenda (bib2) 1990; 28 Carlier, Pinson (bib5) 1989; 35 Liao, You (bib8) 1992; 43 Raman, Talbot (bib10) 1993; 69 Applegate, Cook (bib3) 1991; 3 Adams, Balas, Zawack (bib1) 1988; 34 Muth, Thompson (bib9) 1963 Vepsalainen, Morton (bib12) 1987; 33 Carlier, Pinson (bib6) 1994; 78 Lawrence (bib7) 1984 Muth (10.1016/j.ijpe.2005.05.004_bib9) 1963 Adams (10.1016/j.ijpe.2005.05.004_bib1) 1988; 34 Raman (10.1016/j.ijpe.2005.05.004_bib10) 1993; 69 Vepsalainen (10.1016/j.ijpe.2005.05.004_bib12) 1987; 33 Applegate (10.1016/j.ijpe.2005.05.004_bib3) 1991; 3 Carlier (10.1016/j.ijpe.2005.05.004_bib6) 1994; 78 Van Laarhoven (10.1016/j.ijpe.2005.05.004_bib11) 1992; 40 Lawrence (10.1016/j.ijpe.2005.05.004_bib7) 1984 Anderson (10.1016/j.ijpe.2005.05.004_bib2) 1990; 28 Liao (10.1016/j.ijpe.2005.05.004_bib8) 1992; 43 Asano (10.1016/j.ijpe.2005.05.004_bib4) 1996; 44 Carlier (10.1016/j.ijpe.2005.05.004_bib5) 1989; 35 |
| References_xml | – volume: 69 start-page: 187 year: 1993 end-page: 199 ident: bib10 article-title: The job shop tardiness problem: A decomposition approach publication-title: European Journal of Operational Research – year: 1984 ident: bib7 article-title: Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques – volume: 34 start-page: 391 year: 1988 end-page: 401 ident: bib1 article-title: The sifting bottleneck procedure for job shop scheduling problem publication-title: Management Science – volume: 35 start-page: 164 year: 1989 end-page: 176 ident: bib5 article-title: An algorithm for solving the job-shop problem publication-title: Management Science – volume: 78 start-page: 146 year: 1994 end-page: 161 ident: bib6 article-title: Adjustment of heads and tails for the job-shop problem publication-title: European Journal of Operational Research – volume: 28 start-page: 2277 year: 1990 end-page: 2292 ident: bib2 article-title: Two new rules to minimize tardiness in a job shop publication-title: International Journal of Production Research – volume: 33 start-page: 1035 year: 1987 end-page: 1047 ident: bib12 article-title: Priority rules for job shops with weighted tardiness costs publication-title: Management Science – volume: 3 start-page: 149 year: 1991 end-page: 156 ident: bib3 article-title: A computation study of the job-shop scheduling problem publication-title: ORSA Journal on Computing – volume: 44 start-page: 35 year: 1996 end-page: 43 ident: bib4 article-title: Single machine scheduling using dominance relation to minimize earliness subject to ready and due times publication-title: International Journal of Production Economics – year: 1963 ident: bib9 article-title: Industrial Scheduling – volume: 40 start-page: 113 year: 1992 end-page: 125 ident: bib11 article-title: Job shop scheduling by simulated annealing publication-title: Operations Research – volume: 43 start-page: 1047 year: 1992 end-page: 1054 ident: bib8 article-title: An improved formulation for the job-shop scheduling problem publication-title: Journal of the Operational Research Society – year: 1963 ident: 10.1016/j.ijpe.2005.05.004_bib9 – volume: 40 start-page: 113 year: 1992 ident: 10.1016/j.ijpe.2005.05.004_bib11 article-title: Job shop scheduling by simulated annealing publication-title: Operations Research doi: 10.1287/opre.40.1.113 – volume: 33 start-page: 1035 year: 1987 ident: 10.1016/j.ijpe.2005.05.004_bib12 article-title: Priority rules for job shops with weighted tardiness costs publication-title: Management Science doi: 10.1287/mnsc.33.8.1035 – volume: 43 start-page: 1047 year: 1992 ident: 10.1016/j.ijpe.2005.05.004_bib8 article-title: An improved formulation for the job-shop scheduling problem publication-title: Journal of the Operational Research Society doi: 10.1057/jors.1992.162 – volume: 78 start-page: 146 year: 1994 ident: 10.1016/j.ijpe.2005.05.004_bib6 article-title: Adjustment of heads and tails for the job-shop problem publication-title: European Journal of Operational Research doi: 10.1016/0377-2217(94)90379-4 – year: 1984 ident: 10.1016/j.ijpe.2005.05.004_bib7 – volume: 34 start-page: 391 year: 1988 ident: 10.1016/j.ijpe.2005.05.004_bib1 article-title: The sifting bottleneck procedure for job shop scheduling problem publication-title: Management Science doi: 10.1287/mnsc.34.3.391 – volume: 35 start-page: 164 year: 1989 ident: 10.1016/j.ijpe.2005.05.004_bib5 article-title: An algorithm for solving the job-shop problem publication-title: Management Science doi: 10.1287/mnsc.35.2.164 – volume: 69 start-page: 187 year: 1993 ident: 10.1016/j.ijpe.2005.05.004_bib10 article-title: The job shop tardiness problem: A decomposition approach publication-title: European Journal of Operational Research doi: 10.1016/0377-2217(93)90163-H – volume: 28 start-page: 2277 year: 1990 ident: 10.1016/j.ijpe.2005.05.004_bib2 article-title: Two new rules to minimize tardiness in a job shop publication-title: International Journal of Production Research doi: 10.1080/00207549008942866 – volume: 3 start-page: 149 year: 1991 ident: 10.1016/j.ijpe.2005.05.004_bib3 article-title: A computation study of the job-shop scheduling problem publication-title: ORSA Journal on Computing doi: 10.1287/ijoc.3.2.149 – volume: 44 start-page: 35 year: 1996 ident: 10.1016/j.ijpe.2005.05.004_bib4 article-title: Single machine scheduling using dominance relation to minimize earliness subject to ready and due times publication-title: International Journal of Production Economics doi: 10.1016/0925-5273(95)00090-9 |
| SSID | ssj0007188 |
| Score | 1.898784 |
| Snippet | Meeting due dates is the most important goal of scheduling if the due date of each job has been promised to its customer. This paper considers the job-shop... |
| SourceID | proquest repec crossref elsevier |
| SourceType | Aggregation Database Index Database Enrichment Source Publisher |
| StartPage | 19 |
| SubjectTerms | Benchmarks Due-date constraints Heuristic Heuristics Holding cost Job shops Job-shop scheduling Management science Production costs Scheduling Scheduling algorithms Shifting bottleneck procedure |
| Title | A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs |
| URI | https://dx.doi.org/10.1016/j.ijpe.2005.05.004 http://econpapers.repec.org/article/eeeproeco/v_3a101_3ay_3a2006_3ai_3a1_3ap_3a19-29.htm https://www.proquest.com/docview/198997000 |
| Volume | 101 |
| WOSCitedRecordID | wos000234645400003&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVESC databaseName: Elsevier SD Freedom Collection Journals 2021 customDbUrl: eissn: 1873-7579 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0007188 issn: 0925-5273 databaseCode: AIEXJ dateStart: 19950301 isFulltext: true titleUrlDefault: https://www.sciencedirect.com providerName: Elsevier |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9NAEF5FDUJwQFBADQW0B26WkRvbsfcYUFFBqHDIIbfV2l5jh8S2Yicq_AR-CT-TGe8jaVArekCKH_JjbWe-3fk8ngchb9gZE6BnEzcQ-JlRssxNIl-6oLujPIc9UlUt-RxdXsbzOfs6GPw2sTDbZVRV8dUVa_6rqGEbCBtDZ-8gbtsobIB1EDrMQeww_yfBT4H8bVT-ZWdRJ25b1I0D77CgU_rQc7H8Vq_Lrlgh7cTMIqvyp-z5Z1f3kZHqe5ST1m1nnc4lElOVqMltVGwBunZhstjWaTcJWnOwvQqYLPoC4JXbfeJ73fK4l69Ct4IolDpI2tL8L4Xithcl6PKitIZr8V10qhaVM8MdBew_NF8YZ0FjhxyHLmaBuzYk746w2FMDrB5flapWtpK_lICyRyzelotGaqsZGs6Cncozn_kPNKH1TzSubwuObWCpzpDjDxPPDsdRyGD8HE4_ns8_Wa0POr7X-uZxdICW8iU8vJObSNDeS85wLRuZ7nGd2WPySL-k0KkC1xMykNUxuW9iJI7Jw70slk_Jrym1iKMGcXSHOGoRR7uaGsRRQBztEUc14igijtY5tYijgDi6Qxw1iKMacdheVdMecXjl9hmZfTifvb9wdYkPNw3GQeemyST0k3EWRsIHLptJrFQivSxhvj_JvFgEMcMBRAZYCiER7ExIrImQsDQSuec_J0dVXckTQqMARpw8FmEicqD4CfOCTHhxIsM08iepNyJn5i_nqU5_j1VYlvxmYY-IY89pVPKXW48OjSS5pq-KlnIA5q3nnRqxc939Wo6ujCwCXI3Iux4J9gaklHA49Ei-5b6ANmH-AybsXLAocSNMDS4ZHzNedKsXd3qQU_Jg11NfkqNuvZGvyL1025Xt-rUG_h8N3ORX |
| linkProvider | Elsevier |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+heuristic+job-shop+scheduling+algorithm+to+minimize+the+total+holding+cost+of+completed+and+in-process+products+subject+to+no+tardy+jobs&rft.jtitle=International+journal+of+production+economics&rft.au=Ohta%2C+Hiroshi&rft.au=Nakatani%2C+Toshihiro&rft.date=2006-05-01&rft.issn=0925-5273&rft.volume=101&rft.issue=1&rft.spage=19&rft.epage=29&rft_id=info:doi/10.1016%2Fj.ijpe.2005.05.004&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_ijpe_2005_05_004 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0925-5273&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0925-5273&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0925-5273&client=summon |