A flexible-reliable operation optimization model of the networked energy hubs with distributed generations, energy storage systems and demand response
This paper presents a novel optimization model for the flexible-reliable operation (FRO) of energy hubs (EHs) in electricity, natural gas, and district heating networks. To achieve flexible EH in the presence of renewable energy sources (RESs) and combined heat and power (CHP) system, energy storage...
Gespeichert in:
| Veröffentlicht in: | Energy (Oxford) Jg. 239; S. 121923 |
|---|---|
| Hauptverfasser: | , , , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Oxford
Elsevier Ltd
15.01.2022
Elsevier BV |
| Schlagworte: | |
| ISSN: | 0360-5442, 1873-6785 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | This paper presents a novel optimization model for the flexible-reliable operation (FRO) of energy hubs (EHs) in electricity, natural gas, and district heating networks. To achieve flexible EH in the presence of renewable energy sources (RESs) and combined heat and power (CHP) system, energy storage systems (ESS) and incentive-based demand response program (IDRP) are used. The proposed problem minimizes the total expected costs of operation, reliability, and flexibility of the energy networks including EHs. The optimization scheme is constrained to the optimal power flow (OPF) equations and the reliability requirements of these networks and the EH model in the presence of sources and active loads, namely ESS and IDRP. Scenario-based stochastic programming (SBSP) is utilized to model uncertainties of load, energy cost, power generation of RES, and network equipment availability. The problem has a mixed-integer nonlinear programming (MINLP) nature. Consequently, a hybrid teaching-learning-based optimization (TLBO) and crow search algorithm (CSA) is used to obtain a reliable optimal solution with a low standard deviation. Finally, by simulating the proposed scheme on a sample test system, the capabilities of this scheme in improving the reliability, operation, and flexibility of energy networks in accordance with the optimal scheduling for EHs are confirmed.
•Modeling flexible-reliable operation in the electricity, gas, and heating networks.•Operation, reliability, flexibility, and economic indices for energy management.•Use of ESS and IDRP to improve EH flexibility in the presence of RES and CHP.•Solving FRO problem of energy networks with EH using hybrid TLBO and CSA. |
|---|---|
| Bibliographie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 content type line 23 |
| ISSN: | 0360-5442 1873-6785 |
| DOI: | 10.1016/j.energy.2021.121923 |