An FPTAS for the parallel two-stage flowshop problem
We consider the NP-hard m-parallel two-stage flowshop problem, abbreviated as the (m,2)-PFS problem, where we need to schedule n jobs to m parallel identical two-stage flowshops in order to minimize the makespan, i.e. the maximum completion time of all the jobs on the m flowshops. The (m,2)-PFS prob...
Uloženo v:
| Vydáno v: | Theoretical computer science Ročník 657; s. 64 - 72 |
|---|---|
| Hlavní autoři: | , , , , , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Elsevier B.V
02.01.2017
|
| Témata: | |
| ISSN: | 0304-3975, 1879-2294 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | We consider the NP-hard m-parallel two-stage flowshop problem, abbreviated as the (m,2)-PFS problem, where we need to schedule n jobs to m parallel identical two-stage flowshops in order to minimize the makespan, i.e. the maximum completion time of all the jobs on the m flowshops. The (m,2)-PFS problem can be decomposed into two subproblems: to assign the n jobs to the m parallel flowshops, and for each flowshop to schedule the jobs assigned to the flowshop. We first present a pseudo-polynomial time dynamic programming algorithm to solve the (m,2)-PFS problem optimally, for any fixed m, based on an earlier idea for solving the (2,2)-PFS problem. Using the dynamic programming algorithm as a subroutine, we design a fully polynomial-time approximation scheme (FPTAS) for the (m,2)-PFS problem. |
|---|---|
| ISSN: | 0304-3975 1879-2294 |
| DOI: | 10.1016/j.tcs.2016.04.046 |