Project Management Model for Constructing a Renewable Energy Plant
A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the proj...
Saved in:
| Published in: | Procedia engineering Vol. 174; pp. 145 - 154 |
|---|---|
| Main Authors: | , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
Elsevier Ltd
2017
|
| Subjects: | |
| ISSN: | 1877-7058, 1877-7058 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Abstract | A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the project under normal condition. When some activities are crashed, the total duration time can be reduced. The total project cost and the total duration time for crashing various activities are calculated. The fuzzy PERT model is developed by the fuzzy multiple objective linear programming, and the model can devise the project implementation plan to maximize the total degree of satisfaction while minimizing total project cost and total duration time. A case study of a wind turbine construction in Taiwan is presented to show the practicality of the proposed models. |
|---|---|
| AbstractList | A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the project under normal condition. When some activities are crashed, the total duration time can be reduced. The total project cost and the total duration time for crashing various activities are calculated. The fuzzy PERT model is developed by the fuzzy multiple objective linear programming, and the model can devise the project implementation plan to maximize the total degree of satisfaction while minimizing total project cost and total duration time. A case study of a wind turbine construction in Taiwan is presented to show the practicality of the proposed models. |
| Author | Lee, Amy H.I. Kang, He-Yau Huang, Tzu-Ting |
| Author_xml | – sequence: 1 givenname: Amy H.I. surname: Lee fullname: Lee, Amy H.I. organization: Department of Technology Management,Chung Hua University, Taiwan – sequence: 2 givenname: He-Yau surname: Kang fullname: Kang, He-Yau email: kanghy@ncut.edu.tw organization: Department of Industrial Engineering and Management, National Chin-Yi University of Technology, Taiwan – sequence: 3 givenname: Tzu-Ting surname: Huang fullname: Huang, Tzu-Ting organization: Department of Industrial Engineering and Management, National Chin-Yi University of Technology, Taiwan |
| BookMark | eNqFkM1Kw0AUhQepYK19Axd5gcS5SZqZuBC0-AcVi-h6uJnchAnpTJmMSt_elLoQF3o352y-A_c7ZRPrLDF2DjwBDsVFl2y9I9smKQeRcEhAFkdsClKIWPCFnPzoJ2w-DB3fn-DpAqbsZu1dRzpET2ixpQ3Zsbqa-qhxPlo6OwT_roOxbYTRC1n6xKqn6NaSb3fRukcbzthxg_1A8--csbe729flQ7x6vn9cXq9inQMPcVZBnTaggYqikmUqClFWgJKnNYhGIIkMqxKxljLPtMjrRUMIWZanJWYCRDZjl4dd7d0weGqUNgGDcTZ4NL0CrvZCVKcOQtReiOKgRiEjnP-Ct95s0O_-w64OGI2PfRjyatCGrKba-NGaqp35e-ALSAN-ig |
| CitedBy_id | crossref_primary_10_4028_www_scientific_net_AMM_892_266 crossref_primary_10_1088_1757_899X_737_1_012037 crossref_primary_10_1080_15623599_2023_2239431 crossref_primary_10_1088_1757_899X_852_1_012087 crossref_primary_10_1177_23998083251347682 crossref_primary_10_3390_en14154661 crossref_primary_10_3390_su152115526 crossref_primary_10_1051_matecconf_201819201027 crossref_primary_10_1109_ACCESS_2021_3077289 crossref_primary_10_35378_gujs_1599844 crossref_primary_10_36004_nier_es_2023_1_02 |
| Cites_doi | 10.1080/00207543.2014.952792 10.1016/j.ejor.2015.06.038 10.1007/s11135-011-9460-y 10.1016/0165-0114(92)90318-X 10.3233/IFS-120751 10.1016/j.amc.2006.01.027 10.1016/0165-0114(78)90031-3 10.1016/j.ejor.2014.11.014 |
| ContentType | Journal Article |
| Copyright | 2017 The Authors |
| Copyright_xml | – notice: 2017 The Authors |
| DBID | 6I. AAFTH AAYXX CITATION |
| DOI | 10.1016/j.proeng.2017.01.186 |
| DatabaseName | ScienceDirect Open Access Titles Elsevier:ScienceDirect:Open Access CrossRef |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering |
| EISSN | 1877-7058 |
| EndPage | 154 |
| ExternalDocumentID | 10_1016_j_proeng_2017_01_186 S1877705817301868 |
| GroupedDBID | --K 0R~ 0SF 1B1 4.4 457 5VS 6I. 71M AACTN AAEDT AAEDW AAFTH AAFWJ AAIKJ AALRI AAQFI AAXUO ABMAC ACGFS ADBBV ADEZE ADMUD AEXQZ AFTJW AGHFR AITUG ALMA_UNASSIGNED_HOLDINGS AMRAJ E3Z EBS EJD EP3 FDB FEDTE FNPLU HVGLF HZ~ IXB KQ8 M41 M~E NCXOZ O-L O9- OK1 OZT P2P RIG ROL SES SSZ XH2 9DU AAYWO AAYXX ABWVN ACRPL ACVFH ADCNI ADNMO ADVLN AEUPX AFPUW AIGII AKBMS AKRWK AKYEP CITATION ~HD |
| ID | FETCH-LOGICAL-c410t-3b1d2f1c1e66b8927679b1a802d17f7ae73ab9aad8843c74d5fea133429a37173 |
| ISICitedReferencesCount | 9 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000399998200017&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 1877-7058 |
| IngestDate | Sat Nov 29 02:10:56 EST 2025 Tue Nov 18 20:53:08 EST 2025 Fri Feb 23 02:47:36 EST 2024 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Keywords | project management Renewable energy program evaluation and review technique (PERT) fuzzy |
| Language | English |
| License | This is an open access article under the CC BY-NC-ND license. |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c410t-3b1d2f1c1e66b8927679b1a802d17f7ae73ab9aad8843c74d5fea133429a37173 |
| OpenAccessLink | https://dx.doi.org/10.1016/j.proeng.2017.01.186 |
| PageCount | 10 |
| ParticipantIDs | crossref_citationtrail_10_1016_j_proeng_2017_01_186 crossref_primary_10_1016_j_proeng_2017_01_186 elsevier_sciencedirect_doi_10_1016_j_proeng_2017_01_186 |
| PublicationCentury | 2000 |
| PublicationDate | 2017 2017-00-00 |
| PublicationDateYYYYMMDD | 2017-01-01 |
| PublicationDate_xml | – year: 2017 text: 2017 |
| PublicationDecade | 2010 |
| PublicationTitle | Procedia engineering |
| PublicationYear | 2017 |
| Publisher | Elsevier Ltd |
| Publisher_xml | – name: Elsevier Ltd |
| References | Chrysafis, Papadopoulos (bib0015) 2014; 26 Jeang (bib0020) 2015; 53 Lai, Hwang (bib0040) 1992; 49 Azaron, Moghaddam (bib0010) 2006; 181 Liang, Huang, Yang (bib0035) 2012; 46 Chrysafis, Papadopoulos (bib0005) 2014; 26 Creemers, DeReyck, Leus (bib0025) 2015; 242 Zimmermann (bib0050) 1978; 1 Yaghoubi, Noori, Azaron, Fynes (bib0030) 2015; 247 Hwang, Yoon (bib0045) 1981 Hwang (10.1016/j.proeng.2017.01.186_bib0045) 1981 Lai (10.1016/j.proeng.2017.01.186_bib0040) 1992; 49 Azaron (10.1016/j.proeng.2017.01.186_bib0010) 2006; 181 Liang (10.1016/j.proeng.2017.01.186_bib0035) 2012; 46 Zimmermann (10.1016/j.proeng.2017.01.186_bib0050) 1978; 1 Creemers (10.1016/j.proeng.2017.01.186_bib0025) 2015; 242 Jeang (10.1016/j.proeng.2017.01.186_bib0020) 2015; 53 Chrysafis (10.1016/j.proeng.2017.01.186_bib0015) 2014; 26 Chrysafis (10.1016/j.proeng.2017.01.186_bib0005) 2014; 26 Yaghoubi (10.1016/j.proeng.2017.01.186_bib0030) 2015; 247 |
| References_xml | – volume: 49 start-page: 121 year: 1992 end-page: 133 ident: bib0040 article-title: A new approach to some possibilistic linear programming problems publication-title: Fuzzy Set Syst – volume: 53 start-page: 1503 year: 2015 end-page: 1526 ident: bib0020 article-title: Project management for uncertainty with multiple objectives optimisation of time, cost and reliability publication-title: Int J Prod Res – volume: 26 start-page: 577 year: 2014 end-page: 587 ident: bib0015 article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics publication-title: J Intell Fuzzy Syst – volume: 242 start-page: 465 year: 2015 end-page: 476 ident: bib0025 article-title: Project planning with alternative technologies in uncertain environments publication-title: Eur J Oper Res – volume: 46 start-page: 1451 year: 2012 end-page: 1470 ident: bib0035 article-title: Application of fuzzy mathematical programming to imprecise project management decisions publication-title: Qual Quant – volume: 26 start-page: 577 year: 2014 end-page: 587 ident: bib0005 article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics publication-title: J Intell Fuzzy Syst – volume: 1 start-page: 45 year: 1978 end-page: 55 ident: bib0050 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Set Syst – volume: 247 start-page: 879 year: 2015 end-page: 894 ident: bib0030 article-title: Resource allocation in multi-class dynamic PERT networks with finite capacity publication-title: Eur J Oper Res – volume: 181 start-page: 163 year: 2006 end-page: 174 ident: bib0010 article-title: A multi-objective resource allocation problem in dynamic PERT networks publication-title: Appl Math Comput – year: 1981 ident: bib0045 article-title: Multiple attribute decision making: methods and applications – volume: 53 start-page: 1503 year: 2015 ident: 10.1016/j.proeng.2017.01.186_bib0020 article-title: Project management for uncertainty with multiple objectives optimisation of time, cost and reliability publication-title: Int J Prod Res doi: 10.1080/00207543.2014.952792 – volume: 247 start-page: 879 year: 2015 ident: 10.1016/j.proeng.2017.01.186_bib0030 article-title: Resource allocation in multi-class dynamic PERT networks with finite capacity publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2015.06.038 – volume: 46 start-page: 1451 year: 2012 ident: 10.1016/j.proeng.2017.01.186_bib0035 article-title: Application of fuzzy mathematical programming to imprecise project management decisions publication-title: Qual Quant doi: 10.1007/s11135-011-9460-y – volume: 49 start-page: 121 issue: 2 year: 1992 ident: 10.1016/j.proeng.2017.01.186_bib0040 article-title: A new approach to some possibilistic linear programming problems publication-title: Fuzzy Set Syst doi: 10.1016/0165-0114(92)90318-X – volume: 26 start-page: 577 issue: 2 year: 2014 ident: 10.1016/j.proeng.2017.01.186_bib0005 article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics publication-title: J Intell Fuzzy Syst doi: 10.3233/IFS-120751 – volume: 181 start-page: 163 issue: 1 year: 2006 ident: 10.1016/j.proeng.2017.01.186_bib0010 article-title: A multi-objective resource allocation problem in dynamic PERT networks publication-title: Appl Math Comput doi: 10.1016/j.amc.2006.01.027 – year: 1981 ident: 10.1016/j.proeng.2017.01.186_bib0045 – volume: 1 start-page: 45 year: 1978 ident: 10.1016/j.proeng.2017.01.186_bib0050 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Set Syst doi: 10.1016/0165-0114(78)90031-3 – volume: 26 start-page: 577 issue: 2 year: 2014 ident: 10.1016/j.proeng.2017.01.186_bib0015 article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics publication-title: J Intell Fuzzy Syst doi: 10.3233/IFS-120751 – volume: 242 start-page: 465 year: 2015 ident: 10.1016/j.proeng.2017.01.186_bib0025 article-title: Project planning with alternative technologies in uncertain environments publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2014.11.014 |
| SSID | ssj0000070251 |
| Score | 2.115452 |
| Snippet | A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied... |
| SourceID | crossref elsevier |
| SourceType | Enrichment Source Index Database Publisher |
| StartPage | 145 |
| SubjectTerms | fuzzy program evaluation and review technique (PERT) project management Renewable energy |
| Title | Project Management Model for Constructing a Renewable Energy Plant |
| URI | https://dx.doi.org/10.1016/j.proeng.2017.01.186 |
| Volume | 174 |
| WOSCitedRecordID | wos000399998200017&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVHPJ databaseName: ROAD: Directory of Open Access Scholarly Resources customDbUrl: eissn: 1877-7058 dateEnd: 20181231 omitProxy: false ssIdentifier: ssj0000070251 issn: 1877-7058 databaseCode: M~E dateStart: 20090101 isFulltext: true titleUrlDefault: https://road.issn.org providerName: ISSN International Centre |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT9wwELYK7QEOiNJWvFr5wA15FcchMzkCAi1ShThsEZwiJ3EkEA0rXgIO_HbGj2RTWNFy6CXatdbOxvNpPBnN9w1jGwZ0FeliS2QVFiKx3J6sNkoojAuECmTiujUc_4TDQzw5yY5Cue21aycATYP399n4v5qaxsjYljr7DnN3i9IAfSaj05XMTtd_MvyRz630CltcwzPHU3T9Ob1irOUm0uZSVO3IU3ueA2h7GP2RrXdEAsLQppkIF74o4tn-_bA5HBwMOt8dUtBDI0717QQ3YXj0eCtG7Soh3-CJlcE5IoCAyEutD8yUsdajQtLzidLrRYbjVXrN6Fee2ycRzu25QQ9ka-7A6qnKaULZLw6wrqywrVg7z_0quV0lj2ROq8ywjzHQ25Ot7nyapOGs3FHsmnR2T9ISLF0V4Ou_Mz2A6QUlo0W2EN4m-LZHwWf2wTRLbL6nMfmF7QQ88AkeuMMDJzzwPh645h0euMcDd3j4yn7t7412hyI0zhBlIqMboQpZxbUspUnTArMYUsgKqTGKKwk1aANKF5nWFWKiSkiqrdpoqRTFJlrZsoxvbLa5bMwy44g032RxbSzjGRMsMdJaKZkaTE2KK0y1u5GXQVXeNje5yN8yxgoT3ayxV1X5y--h3eg8RIY-4ssJPm_OXH3nndbYnP3mk2zrbJZMYL6zT-Xdzdn11Q-HnWdzRoOd |
| linkProvider | ISSN International Centre |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+Management+Model+for+Constructing+a+Renewable+Energy+Plant&rft.jtitle=Procedia+engineering&rft.au=Lee%2C+Amy+H.I.&rft.au=Kang%2C+He-Yau&rft.au=Huang%2C+Tzu-Ting&rft.date=2017&rft.issn=1877-7058&rft.eissn=1877-7058&rft.volume=174&rft.spage=145&rft.epage=154&rft_id=info:doi/10.1016%2Fj.proeng.2017.01.186&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_proeng_2017_01_186 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1877-7058&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1877-7058&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1877-7058&client=summon |