Planning Allocation for GTO-GEO Transfer Spacecraft with Triple Orthogonal Gimbaled Thruster Boom

This paper proposes an electric propulsion platform based on a triple orthogonal gimbaled thruster boom to realize the GTO-GEO transfer process. The adjustment mechanism of the gimbaled thruster boom significantly improves the range of thrust vector variation enhances the efficiency of thrust vector...

Full description

Saved in:
Bibliographic Details
Published in:Mathematics (Basel) Vol. 11; no. 13; p. 2844
Main Authors: Ma, Guangfu, Kong, Xianglong
Format: Journal Article
Language:English
Published: Basel MDPI AG 01.07.2023
Subjects:
ISSN:2227-7390, 2227-7390
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper proposes an electric propulsion platform based on a triple orthogonal gimbaled thruster boom to realize the GTO-GEO transfer process. The adjustment mechanism of the gimbaled thruster boom significantly improves the range of thrust vector variation enhances the efficiency of thrust vector adjustment, and reduces the spacecraft burn-up. Additionally, to achieve the application performance, a planning allocation method based on the model prediction algorithm is proposed and verified through numerical simulation.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:2227-7390
2227-7390
DOI:10.3390/math11132844