Coordination-based reactive resource-constrained project scheduling

Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently to start the construction activities relating to the blocks on time. Especially when the construction schedule is disrupted by an unexpected e...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Procedia CIRP Ročník 81; s. 51 - 56
Hlavní autori: Joo, Byung Jun, Chua, Tay Jin, Cai, Tian Xiang, Chua, Ping Chong
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Elsevier B.V 2019
Predmet:
ISSN:2212-8271, 2212-8271
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently to start the construction activities relating to the blocks on time. Especially when the construction schedule is disrupted by an unexpected event, it needs to be revised by coordinating the delivery times of prefabricated blocks from suppliers, subject to the limited storage space, for minimizing the impact on the project duration. In this paper, a coordination-based reactive scheduling procedure is proposed for a reactive multimode resource-constrained project scheduling problem with limited on-site storage space and its effectiveness is validated through computational experiments. The authors expect that the proposed procedure is also applicable to engineer-to-order (ETO) and make-to-order (MTO) manufacturing systems with limited on-site storage space for raw materials.
ISSN:2212-8271
2212-8271
DOI:10.1016/j.procir.2019.03.010