Cost, emission and reserve pondered pre-dispatch of thermal power generating units coordinated with real coded grey wolf optimisation
The optimisation of unit commitment (UC) problem in the daily operation and planning of the power system may save the electric utilities millions of dollars per year in production costs. Though many works in the literature uses evolutionary techniques to solve the pre-dispatch of thermal power gener...
Uložené v:
| Vydané v: | IET generation, transmission & distribution Ročník 10; číslo 4; s. 972 - 985 |
|---|---|
| Hlavní autori: | , , , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
The Institution of Engineering and Technology
10.03.2016
|
| Predmet: | |
| ISSN: | 1751-8687, 1751-8695 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!