Optimal water resource planning under fixed budget by interval-parameter credibility constrained programming

In this study, an interval credibility constrained programming (ICCP) was developed through introducing the concept of intervals into credibility constrained programming framework. Interval credibility levels can help decision makers to reflect uncertainties of preferences. By ICCP, a water resource...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Engineering optimization Ročník 43; číslo 8; s. 879 - 889
Hlavní autori: Zhang, Y. M., Huang, G. H.
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Abingdon Taylor & Francis 01.08.2011
Taylor & Francis Ltd
Predmet:
ISSN:0305-215X, 1029-0273
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:In this study, an interval credibility constrained programming (ICCP) was developed through introducing the concept of intervals into credibility constrained programming framework. Interval credibility levels can help decision makers to reflect uncertainties of preferences. By ICCP, a water resource planning model with fixed fuzzy budget was developed for supporting the planning of agriculture development and environmental protection. Surface and ground water were planned for regional irrigation in wet and normal seasons. For the interval credibility preference, best and worst cases were analysed. The tradeoff between the budget and the benefit were studied by sensitive analysis. The results showed that the current water resource budget is reasonable.
Bibliografia:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-1
ObjectType-Feature-2
content type line 23
ObjectType-Article-2
ISSN:0305-215X
1029-0273
DOI:10.1080/0305215X.2010.522709