Integrated scheduling and batch ordering for construction project
Multi-Mode Resource Constrained Project Scheduling Problem and material batch ordering for construction project are integrated to help project manager consider various trade-offs among several costs, such as renewable resources’ cost, material price, ordering cost, back-ordering cost, inventory hold...
Saved in:
| Published in: | Applied mathematical modelling Vol. 38; no. 2; pp. 784 - 797 |
|---|---|
| Main Author: | |
| Format: | Journal Article |
| Language: | English |
| Published: |
Elsevier Inc
15.01.2014
|
| Subjects: | |
| ISSN: | 0307-904X |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | Multi-Mode Resource Constrained Project Scheduling Problem and material batch ordering for construction project are integrated to help project manager consider various trade-offs among several costs, such as renewable resources’ cost, material price, ordering cost, back-ordering cost, inventory holding cost and reward/penalty for early/late project completion. Therefore, we prove a mixed integer programming model and impel to calculate inventory holding cost and back order cost in objective function. Moreover, a hybrid algorithm combined adapted harmony search and genetic algorithm is proposed correspondingly. In order to inherit elitist solution and maintain population’s diversity simultaneously, we add a selection operator when the harmony memory is initialized and modify the replacement operator based on distance. Besides, genetic algorithm is adopted based on a ‘012’ coding scheme. Finally, algorithm and model performance is presented and several project instances are provided with different network structures and realizations to discuss the factors on total cost. |
|---|---|