Integrated scheduling and batch ordering for construction project

Multi-Mode Resource Constrained Project Scheduling Problem and material batch ordering for construction project are integrated to help project manager consider various trade-offs among several costs, such as renewable resources’ cost, material price, ordering cost, back-ordering cost, inventory hold...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Applied mathematical modelling Ročník 38; číslo 2; s. 784 - 797
Hlavný autor: Fu, Fang
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Elsevier Inc 15.01.2014
Predmet:
ISSN:0307-904X
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:Multi-Mode Resource Constrained Project Scheduling Problem and material batch ordering for construction project are integrated to help project manager consider various trade-offs among several costs, such as renewable resources’ cost, material price, ordering cost, back-ordering cost, inventory holding cost and reward/penalty for early/late project completion. Therefore, we prove a mixed integer programming model and impel to calculate inventory holding cost and back order cost in objective function. Moreover, a hybrid algorithm combined adapted harmony search and genetic algorithm is proposed correspondingly. In order to inherit elitist solution and maintain population’s diversity simultaneously, we add a selection operator when the harmony memory is initialized and modify the replacement operator based on distance. Besides, genetic algorithm is adopted based on a ‘012’ coding scheme. Finally, algorithm and model performance is presented and several project instances are provided with different network structures and realizations to discuss the factors on total cost.
Bibliografia:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ObjectType-Article-1
ObjectType-Feature-2
ISSN:0307-904X
DOI:10.1016/j.apm.2013.07.017