Scheduling on a proportionate flowshop to minimise total late work

We study a scheduling problem to minimise total late work, i.e. each job is penalised according to the duration of its parts scheduled after its due-date. The machine setting is an m-machine proportionate flow shop. Two versions of the problem are studied: (i) the case that total late work refers to...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:International journal of production research Ročník 57; číslo 2; s. 531 - 543
Hlavní autori: Gerstl, Enrique, Mor, Baruch, Mosheiov, Gur
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: London Taylor & Francis 17.01.2019
Taylor & Francis LLC
Predmet:
ISSN:0020-7543, 1366-588X
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:We study a scheduling problem to minimise total late work, i.e. each job is penalised according to the duration of its parts scheduled after its due-date. The machine setting is an m-machine proportionate flow shop. Two versions of the problem are studied: (i) the case that total late work refers to the last operation of the job (i.e. the operation performed on the last machine of the flow shop); (ii) the case that total late work refers to all the operations (on all machines). Both versions are known to be NP-hard. We prove a crucial property of an optimal schedule, and consequently introduce efficient pseudo-polynomial dynamic programming algorithms for the two versions. The dynamic programming algorithms are tested numerically and proved to perform well on large size instances.
Bibliografia:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2018.1456693