A three-machine permutation flow-shop problem with minimum makespan on the second machine
In this paper, we consider a three-machine permutation flow-shop scheduling problem where the criterion is to minimize the total completion time without idle times subject to the minimum makespan on the second machine. This problem is NP-hard while each of the objective functions alone can be optimi...