Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation

•Propose a joint optimization model for train scheduling and maintenance planning in a railway network.•Develop a heuristic algorithm using Lagrangian relaxation to solve the ILP model.•Apply the proposed model and algorithm to a practical problem in the Chinese railway network. Train scheduling and...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Transportation research. Part B: methodological Ročník 134; s. 64 - 92
Hlavní autoři: Zhang, Chuntian, Gao, Yuan, Yang, Lixing, Gao, Ziyou, Qi, Jianguo
Médium: Journal Article
Jazyk:angličtina
Vydáno: Oxford Elsevier Ltd 01.04.2020
Elsevier Science Ltd
Témata:
ISSN:0191-2615, 1879-2367
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:•Propose a joint optimization model for train scheduling and maintenance planning in a railway network.•Develop a heuristic algorithm using Lagrangian relaxation to solve the ILP model.•Apply the proposed model and algorithm to a practical problem in the Chinese railway network. Train scheduling and maintenance planning compete for the resources in a railway network. A commonly used way is dealing with maintenance planning first and then train scheduling, or vice versa. In this paper, we propose a joint optimization model for the two problems in a railway network with double-track, where the upstream and downstream trains are independent and a maintenance task on a section cannot be split or disrupted. In order to solve the model, a heuristic algorithm using Lagrangian relaxation is developed. Due to the large number of constraints, we use a dynamic constraint-generation technique in the iterations of the sub-gradient optimization procedure. We apply the model and algorithm to a practical problem in the Chinese railway network, in which some additional trains are inserted into a fixed existing timetable and the maintenance plan on the involved high-speed railway sections is adjusted. The computational results illustrate the effectiveness and efficiency of the proposed model and algorithm.
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0191-2615
1879-2367
DOI:10.1016/j.trb.2020.02.008