Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies

This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. Hence, this paper mathematic...

Full description

Saved in:
Bibliographic Details
Published in:TOP Vol. 25; no. 1; pp. 49 - 79
Main Authors: Zoraghi, Nima, Shahsavar, Aria, Abbasi, Babak, Van Peteghem, Vincent
Format: Journal Article
Language:English
Published: Berlin/Heidelberg Springer Berlin Heidelberg 01.04.2017
Springer Nature B.V
Subjects:
ISSN:1134-5764, 1863-8279
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first