Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies

This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. Hence, this paper mathematic...

Full description

Saved in:
Bibliographic Details
Published in:TOP Vol. 25; no. 1; pp. 49 - 79
Main Authors: Zoraghi, Nima, Shahsavar, Aria, Abbasi, Babak, Van Peteghem, Vincent
Format: Journal Article
Language:English
Published: Berlin/Heidelberg Springer Berlin Heidelberg 01.04.2017
Springer Nature B.V
Subjects:
ISSN:1134-5764, 1863-8279
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. Hence, this paper mathematically formulates the model for the multi-mode resource-constrained project scheduling with material ordering (MRCPSMO) problem. In order to be more realistic, bonus and penalty policies are included for the project. The objective function of the model consists of four elements: the material holding cost, the material ordering cost, the bonus paid by the client and the cost of delay in the project completion. Since MRCPSMO is NP-hard, the paper proposes three hybrid meta-heuristic algorithms called PSO-GA, GA-GA and SA-GA to obtain near-optimal solutions. In addition, the design of experiments and Taguchi method is used to tune the algorithms’ parameters. The proposed algorithms consist of two components: an outside search, in which the algorithm searches for the best schedule and mode assignment, and the inside search, which determines the time and quantity of orders of the nonrenewable resources. First, a comparison is made for each individual component with the exact or best solutions available in the literature. Then, a set of standard PROGEN test problems is solved by the proposed hybrid algorithms under fixed CPU time. The results reveal that the PSO-GA algorithm outperforms both GA-GA and SA-GA algorithms and provides good solutions in a reasonable time.
AbstractList This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. Hence, this paper mathematically formulates the model for the multi-mode resource-constrained project scheduling with material ordering (MRCPSMO) problem. In order to be more realistic, bonus and penalty policies are included for the project. The objective function of the model consists of four elements: the material holding cost, the material ordering cost, the bonus paid by the client and the cost of delay in the project completion. Since MRCPSMO is NP-hard, the paper proposes three hybrid meta-heuristic algorithms called PSO-GA, GA-GA and SA-GA to obtain near-optimal solutions. In addition, the design of experiments and Taguchi method is used to tune the algorithms’ parameters. The proposed algorithms consist of two components: an outside search, in which the algorithm searches for the best schedule and mode assignment, and the inside search, which determines the time and quantity of orders of the nonrenewable resources. First, a comparison is made for each individual component with the exact or best solutions available in the literature. Then, a set of standard PROGEN test problems is solved by the proposed hybrid algorithms under fixed CPU time. The results reveal that the PSO-GA algorithm outperforms both GA-GA and SA-GA algorithms and provides good solutions in a reasonable time.
Author Van Peteghem, Vincent
Shahsavar, Aria
Zoraghi, Nima
Abbasi, Babak
Author_xml – sequence: 1
  givenname: Nima
  surname: Zoraghi
  fullname: Zoraghi, Nima
  organization: Faculty of Industrial and Mechanical Engineering, Islamic Azad University
– sequence: 2
  givenname: Aria
  surname: Shahsavar
  fullname: Shahsavar, Aria
  email: m.shahsavar@ymail.com
  organization: Faculty of Industrial and Mechanical Engineering, Islamic Azad University
– sequence: 3
  givenname: Babak
  surname: Abbasi
  fullname: Abbasi, Babak
  organization: School of Business IT and Logistics, RMIT University
– sequence: 4
  givenname: Vincent
  surname: Van Peteghem
  fullname: Van Peteghem, Vincent
  organization: EDHEC Business School
BookMark eNp9kMFOHSEUhonRxKv1AdxN0jXtgYGBWTam1SbXuLFrwgCj3MyFKTBp3PUd-oY-iUyuC2NiV_yB85H_fGfoOMTgELok8IUAiK-ZEMEBA-kwMMIxPUIbIrsWSyr645pJyzAXHTtFZznvADrRtbBB8-0yFY_30bomuRyXZBw2MeSStA_ONnOKO2dKk82js8vkw8N6NUxu3_zx5bHZ6-KS11MTk62hPi-hhmaIYcnPf__NLuipPDVznLzxLn9CJ6Oesrt4Pc_Rrx_f769u8Pbu-ufVty02rYSCyWi47EdDwULfg2R07MXIwbXdYKlmYhCMS8p1a5i2LWjGLbO8l5pYavuhPUefD__Wtr8Xl4va1eVql6yIlCAYk0TWKXKYMinmnNyo5uT3Oj0pAmoVqw5iVRWrVrGKVka8Y4wvuvgYVmfTf0l6IPO8mnLpTacPoRdmsZH8
CitedBy_id crossref_primary_10_1016_j_cie_2022_108711
crossref_primary_10_1016_j_cie_2021_107345
crossref_primary_10_1016_j_cie_2023_109608
crossref_primary_10_1080_23302674_2025_2545517
crossref_primary_10_1108_ECAM_07_2023_0754
crossref_primary_10_1016_j_cie_2019_01_007
crossref_primary_10_1016_j_cie_2021_107427
crossref_primary_10_1007_s10479_024_06310_z
crossref_primary_10_1016_j_autcon_2022_104336
crossref_primary_10_1016_j_eswa_2020_114475
crossref_primary_10_1108_SASBE_03_2025_0111
crossref_primary_10_1016_j_cie_2018_08_036
crossref_primary_10_1007_s12652_018_0771_x
crossref_primary_10_1080_01605682_2019_1610340
crossref_primary_10_1051_e3sconf_202125101013
crossref_primary_10_1016_j_ejor_2021_05_004
crossref_primary_10_1108_ECAM_01_2024_0004
crossref_primary_10_3390_app11125531
crossref_primary_10_1108_ECAM_10_2019_0563
crossref_primary_10_1007_s12351_016_0266_5
crossref_primary_10_1007_s00500_023_09467_0
crossref_primary_10_1002_j_2334_5837_2019_00657_x
crossref_primary_10_1080_15623599_2023_2222995
crossref_primary_10_1007_s12063_024_00532_x
crossref_primary_10_1016_j_aei_2020_101039
crossref_primary_10_1016_j_cor_2024_106624
crossref_primary_10_1108_ECAM_06_2018_0246
crossref_primary_10_1038_s41598_023_45970_y
crossref_primary_10_1016_j_autcon_2023_104958
crossref_primary_10_1007_s44196_025_00898_1
crossref_primary_10_1007_s10668_025_06715_1
crossref_primary_10_1007_s11356_023_26361_2
crossref_primary_10_1108_BEPAM_02_2024_0023
crossref_primary_10_1061_JCEMD4_COENG_14738
Cites_doi 10.1016/j.ejor.2003.10.053
10.1016/j.ejor.2009.03.034
10.1016/S0377-2217(96)00170-1
10.1007/978-1-4615-5533-9_7
10.1002/nav.20043
10.1111/j.1467-8667.2005.00420.x
10.1016/j.cor.2008.11.010
10.1287/mnsc.5.1.89
10.1057/palgrave.jors.2601563
10.1287/opre.7.5.646
10.1016/S0377-2217(97)00348-2
10.1287/mnsc.28.10.1197
10.1016/j.ejor.2011.03.019
10.1016/j.ejor.2006.03.056
10.1016/j.advengsoft.2010.03.002
10.1016/0377-2217(93)90185-P
10.1016/0272-6963(87)90015-5
10.1016/0377-2217(95)00158-1
10.1016/j.orl.2007.01.003
10.1016/0272-6963(84)90022-6
10.1016/j.cie.2006.08.006
10.1007/s00182-006-0058-x
10.1126/science.220.4598.671
10.1007/s10732-010-9152-0
10.1016/0272-6963(80)90013-3
10.1023/A:1016300218643
10.1016/0377-2217(95)00359-2
10.1023/A:1010954031930
10.1016/j.ejor.2010.03.037
10.1080/00207549308956882
10.1016/j.ejor.2006.06.069
10.1023/A:1010994519405
10.1023/A:1010902015091
10.1023/A:1016372707256
10.1080/07408178708975378
10.1016/j.cor.2006.11.003
10.1287/mnsc.41.10.1693
10.1016/j.ins.2011.06.014
10.1016/j.ejor.2006.07.053
10.1016/B978-0-444-87358-3.50005-5
10.1016/j.amc.2007.04.096
10.1016/j.ejor.2009.12.014
10.1109/ICNN.1995.488968
10.1145/1460299.1460318
ContentType Journal Article
Copyright Sociedad de Estadística e Investigación Operativa 2016
Copyright Springer Science & Business Media 2017
Copyright_xml – notice: Sociedad de Estadística e Investigación Operativa 2016
– notice: Copyright Springer Science & Business Media 2017
DBID AAYXX
CITATION
DOI 10.1007/s11750-016-0415-2
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Economics
Mathematics
EISSN 1863-8279
EndPage 79
ExternalDocumentID 10_1007_s11750_016_0415_2
GroupedDBID -4X
-57
-5G
-BR
-EM
-Y2
-~C
.VR
06D
0R~
0VY
123
1N0
1SB
2.D
203
29Q
2J2
2JN
2JY
2KG
2LR
2VQ
2~H
30V
4.4
406
408
40D
40E
5VS
67Z
6NX
8TC
95-
95.
95~
96X
AAAVM
AABHQ
AACDK
AAHNG
AAIAL
AAJBT
AAJKR
AANZL
AARHV
AARTL
AASML
AATNV
AATVU
AAUYE
AAWCG
AAYIU
AAYQN
AAYTO
AAYZH
ABAKF
ABDZT
ABECU
ABFTV
ABHQN
ABJNI
ABJOX
ABKCH
ABMNI
ABMQK
ABNWP
ABQBU
ABQSL
ABSXP
ABTEG
ABTHY
ABTKH
ABTMW
ABULA
ABWNU
ABXPI
ACAOD
ACBXY
ACDTI
ACGFS
ACHSB
ACIWK
ACKNC
ACMDZ
ACMLO
ACOKC
ACOMO
ACPIV
ACSNA
ACZOJ
ADHHG
ADHIR
ADINQ
ADKNI
ADKPE
ADRFC
ADTPH
ADURQ
ADYFF
ADZKW
AEBTG
AEFQL
AEGAL
AEGNC
AEJHL
AEJRE
AEKMD
AEMSY
AENEX
AEOHA
AEPYU
AESKC
AETLH
AEVLU
AEXYK
AFBBN
AFEXP
AFGCZ
AFLOW
AFQWF
AFWTZ
AFZKB
AGAYW
AGDGC
AGGDS
AGJBK
AGMZJ
AGQEE
AGQMX
AGWIL
AGWZB
AGYKE
AHAVH
AHBYD
AHSBF
AHYZX
AIAKS
AIGIU
AIIXL
AILAN
AITGF
AJBLW
AJRNO
AJZVZ
ALFXC
ALMA_UNASSIGNED_HOLDINGS
ALWAN
AMKLP
AMXSW
AMYLF
AMYQR
AOCGG
ARMRJ
ASPBG
AVWKF
AXYYD
AYQZM
AZFZN
B-.
BA0
BAPOH
BBWZM
BDATZ
BGNMA
CAG
COF
CS3
CSCUP
DDRTE
DNIVK
DPUIP
DU5
EBLON
EBS
EIOEI
EJD
ESBYG
FEDTE
FERAY
FFXSO
FIGPU
FINBP
FNLPD
FRRFC
FSGXE
FWDCC
GGCAI
GGRSB
GJIRD
GNWQR
GQ6
GQ7
H13
HF~
HG5
HG6
HMJXF
HRMNR
HVGLF
HZ~
IJ-
IKXTQ
ITM
IWAJR
IXC
IXE
IZQ
I~X
I~Z
J-C
J0Z
JBSCW
JZLTJ
KDC
KOV
LLZTM
M4Y
MA-
N2Q
NB0
NDZJH
NF0
NPVJJ
NQJWS
NU0
O9-
O93
O9G
O9I
O9J
OAM
P19
P2P
P9M
PF0
PT4
PT5
QOK
QOS
R4E
R89
R9I
RHV
RNI
ROL
RPX
RSV
RZK
S16
S1Z
S26
S27
S28
S3B
SAP
SBE
SCF
SCLPG
SDH
SDM
SHX
SISQX
SJYHP
SNE
SNPRN
SNX
SOHCF
SOJ
SPISZ
SRMVM
SSLCW
STPWE
SZN
T13
T16
TSG
TSK
TSV
TUC
U2A
UG4
UOJIU
UTJUX
UZXMN
VC2
VFIZW
W48
WK8
YLTOR
Z45
ZMTXR
ZYFGU
~A9
~EX
AAPKM
AAYXX
ABBRH
ABDBE
ABFSG
ABRTQ
ACSTC
ADHKG
AEZWR
AFDZB
AFHIU
AFOHR
AGQPQ
AHPBZ
AHWEU
AIXLP
ATHPR
AYFIA
CITATION
ID FETCH-LOGICAL-c380t-1fc589fc20d0990842f97f50e36bd2a47b745825a3c4ad30a45d4d598a1d2d9b3
IEDL.DBID RSV
ISICitedReferencesCount 42
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000398727600006&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1134-5764
IngestDate Sat Oct 18 22:43:38 EDT 2025
Sat Nov 29 04:34:02 EST 2025
Tue Nov 18 21:22:48 EST 2025
Fri Feb 21 02:31:53 EST 2025
IsPeerReviewed true
IsScholarly true
Issue 1
Keywords 90-02
Multi-mode resource-constrained
Genetic algorithm
90C11
Simulated annealing
90B35
Project scheduling
90B05
Particle swarm optimization
Material ordering
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c380t-1fc589fc20d0990842f97f50e36bd2a47b745825a3c4ad30a45d4d598a1d2d9b3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
PQID 1880744818
PQPubID 2044103
PageCount 31
ParticipantIDs proquest_journals_1880744818
crossref_primary_10_1007_s11750_016_0415_2
crossref_citationtrail_10_1007_s11750_016_0415_2
springer_journals_10_1007_s11750_016_0415_2
PublicationCentury 2000
PublicationDate 2017-04-01
PublicationDateYYYYMMDD 2017-04-01
PublicationDate_xml – month: 04
  year: 2017
  text: 2017-04-01
  day: 01
PublicationDecade 2010
PublicationPlace Berlin/Heidelberg
PublicationPlace_xml – name: Berlin/Heidelberg
– name: Heidelberg
PublicationSubtitle An Official Journal of the Spanish Society of Statistics and Operations Research
PublicationTitle TOP
PublicationTitleAbbrev TOP
PublicationYear 2017
Publisher Springer Berlin Heidelberg
Springer Nature B.V
Publisher_xml – name: Springer Berlin Heidelberg
– name: Springer Nature B.V
References Taguchi, Wu (CR49) 1980
Zhang, Tam, Li (CR56) 2006; 21
Castro, Gomez, Tejada (CR8) 2007; 35
He, Xu (CR20) 2008; 189
Shadrokh, Kianfar (CR40) 2007; 181
Hartmann, Sprecher (CR19) 1996; 94
Estévez-Fernández, Borm, Hamers (CR16) 2007; 36
Coelho, Vanhoucke (CR11) 2011; 213
Patterson, Słowinski, Talbot, Weglarz, Slowinski, Weglarz (CR36) 1989
Chung, Chiang, Lu (CR10) 1987; 7
Dodin, Elimam (CR13) 2001; 33
Malcolm, Roseboom, Clark, Fazar (CR32) 1959; 7
Sajadieh, Shadrokh, Hassanzadeh (CR38) 2009; 16
Schmitt, Faaland (CR39) 2004; 51
Mika, Waligóra, Weglarz (CR34) 2008; 187
Wagner, Within (CR53) 1985; 5
Smith-Daniels, Aquilano (CR44) 1984; 4
CR7
Silver, Meal (CR42) 1973; 14
Slowinski (CR43) 1980; 8
CR48
Boctor (CR5) 1996; 90
Kolisch, Hartmann, Weglarz (CR29) 1999
Kolisch, Sprecher, Drexl (CR31) 1995; 41
Boctor (CR4) 1993; 31
Castro, Gomez, Tejada (CR9) 2008; 35
Van Peteghem, Vanhoucke (CR52) 2011; 17
Van Peteghem, Vanhoucke (CR51) 2010; 201
Speranza, Vercellis (CR46) 1993; 64
Bergantinos, Sanchez (CR3) 2002; 109
Phadke (CR37) 1989
Alcaraz, Maroto, Ruiz (CR1) 2003; 54
Branzei, Ferrari, Fragnelli, Tijs (CR6) 2002; 109
Kelly, Scheduling (CR24) 1963
Holland (CR21) 1975
CR14
Jarboui, Damak, Siarry, Rebai (CR22) 2008; 195
Özdamar (CR35) 1999; 29
Hartmann (CR18) 2001; 102
Smith-Daniels, Smith-Daniels (CR45) 1987; 19
Shahsavar, Niaki, Najafi (CR41) 2010; 41
Erabsi, Sepil (CR15) 1999; 6
Kolisch, Sprecher (CR30) 1996; 96
Sprecher, Drexl (CR47) 1998; 107
Aquilano, Smith (CR2) 1980; 1
Gaafar (CR17) 2006; 51
Kolisch, Drexl (CR28) 1997; 29
Józefowska, Mika, Rózycki, Waligóra, Weglarz (CR23) 2001; 102
Damak, Jarboui, Siarry, Loukil (CR12) 2009; 36
Talbot (CR50) 1982; 28
Wang, Fang (CR54) 2011; 181
CR26
CR25
Weglarz, Józefowska, Mika, Waligóra (CR55) 2011; 208
Mika, Waligóra, Weglarz (CR33) 2005; 164
Kirkpatrick, Gelatt, Vecchi (CR27) 1983; 220
M Mika (415_CR34) 2008; 187
J Alcaraz (415_CR1) 2003; 54
S Hartmann (415_CR18) 2001; 102
A Sprecher (415_CR47) 1998; 107
EA Silver (415_CR42) 1973; 14
T Schmitt (415_CR39) 2004; 51
NJ Aquilano (415_CR2) 1980; 1
R Kolisch (415_CR28) 1997; 29
M Speranza (415_CR46) 1993; 64
J Weglarz (415_CR55) 2011; 208
C Chung (415_CR10) 1987; 7
S Hartmann (415_CR19) 1996; 94
S Shadrokh (415_CR40) 2007; 181
415_CR48
F Talbot (415_CR50) 1982; 28
HM Wagner (415_CR53) 1985; 5
R Slowinski (415_CR43) 1980; 8
B Jarboui (415_CR22) 2008; 195
A Erabsi (415_CR15) 1999; 6
J Józefowska (415_CR23) 2001; 102
R Branzei (415_CR6) 2002; 109
M Shahsavar (415_CR41) 2010; 41
DE Smith-Daniels (415_CR45) 1987; 19
415_CR7
L Wang (415_CR54) 2011; 181
J Castro (415_CR8) 2007; 35
R Kolisch (415_CR31) 1995; 41
N Damak (415_CR12) 2009; 36
415_CR14
J Coelho (415_CR11) 2011; 213
R Kolisch (415_CR29) 1999
DE Smith-Daniels (415_CR44) 1984; 4
H Zhang (415_CR56) 2006; 21
R Kolisch (415_CR30) 1996; 96
G Bergantinos (415_CR3) 2002; 109
L Özdamar (415_CR35) 1999; 29
JH Patterson (415_CR36) 1989
V Peteghem Van (415_CR52) 2011; 17
DG Malcolm (415_CR32) 1959; 7
B Dodin (415_CR13) 2001; 33
J Holland (415_CR21) 1975
415_CR25
415_CR26
L Gaafar (415_CR17) 2006; 51
J Castro (415_CR9) 2008; 35
S Kirkpatrick (415_CR27) 1983; 220
MS Phadke (415_CR37) 1989
JE Kelly (415_CR24) 1963
M Mika (415_CR33) 2005; 164
G Taguchi (415_CR49) 1980
FF Boctor (415_CR5) 1996; 90
FF Boctor (415_CR4) 1993; 31
A Estévez-Fernández (415_CR16) 2007; 36
Z He (415_CR20) 2008; 189
MS Sajadieh (415_CR38) 2009; 16
V Peteghem Van (415_CR51) 2010; 201
References_xml – volume: 164
  start-page: 639
  year: 2005
  end-page: 668
  ident: CR33
  article-title: Simulated annealing and Tabu-search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2003.10.053
– year: 1989
  ident: CR37
  publication-title: Quality engineering using robust design
– volume: 201
  start-page: 409
  year: 2010
  end-page: 418
  ident: CR51
  article-title: Genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2009.03.034
– volume: 96
  start-page: 205
  issue: 1
  year: 1996
  end-page: 216
  ident: CR30
  article-title: PSPLIB- a project scheduling problem library
  publication-title: Euro J Oper Res
  doi: 10.1016/S0377-2217(96)00170-1
– start-page: 147
  year: 1999
  end-page: 178
  ident: CR29
  article-title: Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis
  publication-title: Project scheduling: recent models, algorithms, and applications
  doi: 10.1007/978-1-4615-5533-9_7
– year: 1980
  ident: CR49
  publication-title: Introduction to off-line quality control
– volume: 51
  start-page: 1102
  issue: 8
  year: 2004
  end-page: 1128
  ident: CR39
  article-title: Scheduling recurrent construction
  publication-title: Naval Res Logist
  doi: 10.1002/nav.20043
– ident: CR25
– volume: 21
  start-page: 93
  year: 2006
  end-page: 103
  ident: CR56
  article-title: Multi mode project scheduling based on particle swarm optimization
  publication-title: Comp Aided Civil Infrastruct Eng
  doi: 10.1111/j.1467-8667.2005.00420.x
– volume: 36
  start-page: 2653
  year: 2009
  end-page: 2659
  ident: CR12
  article-title: Differential evolution for solving multi-mode resource-constrained project scheduling problems
  publication-title: Comp Oper Res
  doi: 10.1016/j.cor.2008.11.010
– volume: 5
  start-page: 89
  issue: 1
  year: 1985
  end-page: 96
  ident: CR53
  article-title: Dynamic version of economic lot size model
  publication-title: Manag Sci
  doi: 10.1287/mnsc.5.1.89
– volume: 54
  start-page: 614
  year: 2003
  end-page: 626
  ident: CR1
  article-title: Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
  publication-title: J Oper Res Soc
  doi: 10.1057/palgrave.jors.2601563
– volume: 7
  start-page: 646
  issue: 5
  year: 1959
  end-page: 669
  ident: CR32
  article-title: Application of a technique for research and development program evaluation
  publication-title: Oper Res
  doi: 10.1287/opre.7.5.646
– volume: 107
  start-page: 431
  year: 1998
  end-page: 450
  ident: CR47
  article-title: Solving multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
  publication-title: Euro J Oper Res
  doi: 10.1016/S0377-2217(97)00348-2
– volume: 28
  start-page: 1197
  issue: 10
  year: 1982
  end-page: 1210
  ident: CR50
  article-title: Resource-constrained project scheduling with time-resource tradeoffs: the non-preemptive case
  publication-title: Manag Sci
  doi: 10.1287/mnsc.28.10.1197
– volume: 213
  start-page: 73
  year: 2011
  end-page: 82
  ident: CR11
  article-title: Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2011.03.019
– volume: 181
  start-page: 86
  year: 2007
  end-page: 101
  ident: CR40
  article-title: A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.03.056
– volume: 41
  start-page: 1023
  issue: 7
  year: 2010
  end-page: 1030
  ident: CR41
  article-title: An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem
  publication-title: Adv Eng Softw
  doi: 10.1016/j.advengsoft.2010.03.002
– volume: 64
  start-page: 312
  year: 1993
  end-page: 325
  ident: CR46
  article-title: Hierarchical models for multi-project planning and scheduling
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(93)90185-P
– volume: 7
  start-page: 165
  issue: 1–2
  year: 1987
  end-page: 177
  ident: CR10
  article-title: An optimal algorithm for the quantity discount problem
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(87)90015-5
– year: 1975
  ident: CR21
  publication-title: Adaptation in natural and artificial systems
– volume: 94
  start-page: 377
  year: 1996
  end-page: 383
  ident: CR19
  article-title: A note on hierarchical models for multi-project planning and scheduling
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(95)00158-1
– volume: 35
  start-page: 791
  year: 2007
  end-page: 798
  ident: CR8
  article-title: A project game for PERT networks
  publication-title: Oper Res Lett
  doi: 10.1016/j.orl.2007.01.003
– start-page: 347
  year: 1963
  end-page: 365
  ident: CR24
  article-title: The critical-path method: resources planning and scheduling
  publication-title: Math and Thompson
– volume: 29
  start-page: 44
  year: 1999
  end-page: 59
  ident: CR35
  article-title: A genetic algorithm approach to a general category project scheduling problem, Part C: applications and Reviews, Man and Cybernetics
  publication-title: IEEE Trans Syst
– volume: 4
  start-page: 369
  year: 1984
  end-page: 388
  ident: CR44
  article-title: Constrained resource project scheduling subject to material constraints
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(84)90022-6
– volume: 16
  start-page: 91
  year: 2009
  end-page: 99
  ident: CR38
  article-title: Concurrent project scheduling and material planning: a genetic algorithm approach
  publication-title: Scientia Iranica
– volume: 51
  start-page: 433
  year: 2006
  end-page: 444
  ident: CR17
  article-title: Applying genetic algorithms to dynamic lot sizing with batch ordering
  publication-title: Comp Indus Eng
  doi: 10.1016/j.cie.2006.08.006
– ident: CR26
– volume: 36
  start-page: 149
  year: 2007
  end-page: 176
  ident: CR16
  article-title: Project games
  publication-title: Int J Game Theory
  doi: 10.1007/s00182-006-0058-x
– volume: 220
  start-page: 671
  issue: 4598
  year: 1983
  end-page: 680
  ident: CR27
  article-title: Optimization by simulated annealing
  publication-title: Science
  doi: 10.1126/science.220.4598.671
– volume: 17
  start-page: 705
  issue: 6
  year: 2011
  end-page: 728
  ident: CR52
  article-title: Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
  publication-title: J Heuristics
  doi: 10.1007/s10732-010-9152-0
– ident: CR14
– volume: 1
  start-page: 57
  issue: 2
  year: 1980
  end-page: 67
  ident: CR2
  article-title: A formal set of algorithms for project scheduling with critical path method material requirements planning
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(80)90013-3
– volume: 109
  start-page: 159
  year: 2002
  end-page: 174
  ident: CR3
  article-title: How to distribute costs associated with a delayed project
  publication-title: Ann Oper Res
  doi: 10.1023/A:1016300218643
– volume: 195
  start-page: 299
  year: 2008
  end-page: 308
  ident: CR22
  article-title: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
  publication-title: Appl Math Comput
– volume: 90
  start-page: 349
  year: 1996
  end-page: 361
  ident: CR5
  article-title: A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(95)00359-2
– volume: 102
  start-page: 137
  year: 2001
  end-page: 155
  ident: CR23
  article-title: Simulated annealing for multi-mode resource-constrained project scheduling
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010954031930
– volume: 208
  start-page: 177
  year: 2011
  end-page: 205
  ident: CR55
  article-title: Project scheduling with finite or infinite number of activity processing modes—a survey
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2010.03.037
– volume: 31
  start-page: 2547
  year: 1993
  end-page: 2558
  ident: CR4
  article-title: Heuristics for scheduling projects with resource restrictions and several resource-duration modes
  publication-title: Int J Prod Res
  doi: 10.1080/00207549308956882
– volume: 187
  start-page: 1238
  year: 2008
  end-page: 1250
  ident: CR34
  article-title: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.06.069
– volume: 29
  start-page: 987
  year: 1997
  end-page: 999
  ident: CR28
  article-title: Local search for non-preemptive multi-mode resource-constrained project scheduling
  publication-title: IIE Trans
– volume: 33
  start-page: 1005
  year: 2001
  end-page: 1018
  ident: CR13
  article-title: Integrated project scheduling and material planning with variable activity duration and rewards
  publication-title: IIE Trans
  doi: 10.1023/A:1010994519405
– volume: 102
  start-page: 111
  year: 2001
  end-page: 135
  ident: CR18
  article-title: Project scheduling with multiple modes: a genetic algorithm
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010902015091
– volume: 109
  start-page: 359
  year: 2002
  end-page: 374
  ident: CR6
  article-title: Two approaches to the problem of sharing delay costs in joint projects
  publication-title: Ann Oper Res
  doi: 10.1023/A:1016372707256
– ident: CR48
– volume: 19
  start-page: 122
  issue: 4
  year: 1987
  end-page: 129
  ident: CR45
  article-title: Optimal project scheduling with materials ordering
  publication-title: IIE Trans
  doi: 10.1080/07408178708975378
– volume: 35
  start-page: 2376
  year: 2008
  end-page: 2387
  ident: CR9
  article-title: A polynomial rule for the problem of sharing delay costs in PERT networks
  publication-title: Comp Oper Res
  doi: 10.1016/j.cor.2006.11.003
– volume: 8
  start-page: 711
  year: 1980
  end-page: 723
  ident: CR43
  article-title: Two approaches to problems of resource allocation among project activities—a comparative study
  publication-title: J Oper Res Soc
– volume: 41
  start-page: 1693
  year: 1995
  end-page: 1703
  ident: CR31
  article-title: Characterization and generation of a general class of resource-constrained project scheduling problems
  publication-title: Manag Sci
  doi: 10.1287/mnsc.41.10.1693
– volume: 14
  start-page: 64
  issue: 2
  year: 1973
  end-page: 74
  ident: CR42
  article-title: A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and desecrate opportunities for replenishment
  publication-title: Produc Invent Manag
– volume: 181
  start-page: 4804
  year: 2011
  end-page: 4822
  ident: CR54
  article-title: An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
  publication-title: Inform Sci
  doi: 10.1016/j.ins.2011.06.014
– ident: CR7
– volume: 189
  start-page: 1191
  year: 2008
  end-page: 1207
  ident: CR20
  article-title: Multi-mode project payment scheduling problems with bonus-penalty structure
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.07.053
– start-page: 3
  year: 1989
  end-page: 28
  ident: CR36
  article-title: An algorithm for a general class of precedence and resource constrained scheduling problems
  publication-title: Adv Project Schedul
  doi: 10.1016/B978-0-444-87358-3.50005-5
– volume: 6
  start-page: 132
  issue: 2
  year: 1999
  end-page: 140
  ident: CR15
  article-title: A modified heuristic procedure for materials management in project networks
  publication-title: Int J Indus Eng Theory
– volume: 90
  start-page: 349
  year: 1996
  ident: 415_CR5
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(95)00359-2
– volume: 109
  start-page: 359
  year: 2002
  ident: 415_CR6
  publication-title: Ann Oper Res
  doi: 10.1023/A:1016372707256
– volume: 41
  start-page: 1023
  issue: 7
  year: 2010
  ident: 415_CR41
  publication-title: Adv Eng Softw
  doi: 10.1016/j.advengsoft.2010.03.002
– volume: 181
  start-page: 4804
  year: 2011
  ident: 415_CR54
  publication-title: Inform Sci
  doi: 10.1016/j.ins.2011.06.014
– volume-title: Introduction to off-line quality control
  year: 1980
  ident: 415_CR49
– volume: 35
  start-page: 2376
  year: 2008
  ident: 415_CR9
  publication-title: Comp Oper Res
  doi: 10.1016/j.cor.2006.11.003
– volume: 19
  start-page: 122
  issue: 4
  year: 1987
  ident: 415_CR45
  publication-title: IIE Trans
  doi: 10.1080/07408178708975378
– volume: 96
  start-page: 205
  issue: 1
  year: 1996
  ident: 415_CR30
  publication-title: Euro J Oper Res
  doi: 10.1016/S0377-2217(96)00170-1
– volume: 189
  start-page: 1191
  year: 2008
  ident: 415_CR20
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.07.053
– volume: 33
  start-page: 1005
  year: 2001
  ident: 415_CR13
  publication-title: IIE Trans
  doi: 10.1023/A:1010994519405
– volume: 102
  start-page: 111
  year: 2001
  ident: 415_CR18
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010902015091
– volume: 51
  start-page: 1102
  issue: 8
  year: 2004
  ident: 415_CR39
  publication-title: Naval Res Logist
  doi: 10.1002/nav.20043
– volume: 220
  start-page: 671
  issue: 4598
  year: 1983
  ident: 415_CR27
  publication-title: Science
  doi: 10.1126/science.220.4598.671
– volume: 213
  start-page: 73
  year: 2011
  ident: 415_CR11
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2011.03.019
– volume: 7
  start-page: 646
  issue: 5
  year: 1959
  ident: 415_CR32
  publication-title: Oper Res
  doi: 10.1287/opre.7.5.646
– volume: 5
  start-page: 89
  issue: 1
  year: 1985
  ident: 415_CR53
  publication-title: Manag Sci
  doi: 10.1287/mnsc.5.1.89
– ident: 415_CR48
– volume-title: Quality engineering using robust design
  year: 1989
  ident: 415_CR37
– volume-title: Adaptation in natural and artificial systems
  year: 1975
  ident: 415_CR21
– start-page: 3
  volume-title: Adv Project Schedul
  year: 1989
  ident: 415_CR36
  doi: 10.1016/B978-0-444-87358-3.50005-5
– volume: 195
  start-page: 299
  year: 2008
  ident: 415_CR22
  publication-title: Appl Math Comput
  doi: 10.1016/j.amc.2007.04.096
– volume: 7
  start-page: 165
  issue: 1–2
  year: 1987
  ident: 415_CR10
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(87)90015-5
– volume: 102
  start-page: 137
  year: 2001
  ident: 415_CR23
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010954031930
– ident: 415_CR14
  doi: 10.1016/j.ejor.2009.12.014
– volume: 187
  start-page: 1238
  year: 2008
  ident: 415_CR34
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.06.069
– volume: 94
  start-page: 377
  year: 1996
  ident: 415_CR19
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(95)00158-1
– start-page: 147
  volume-title: Project scheduling: recent models, algorithms, and applications
  year: 1999
  ident: 415_CR29
  doi: 10.1007/978-1-4615-5533-9_7
– ident: 415_CR26
  doi: 10.1109/ICNN.1995.488968
– volume: 64
  start-page: 312
  year: 1993
  ident: 415_CR46
  publication-title: Euro J Oper Res
  doi: 10.1016/0377-2217(93)90185-P
– volume: 36
  start-page: 149
  year: 2007
  ident: 415_CR16
  publication-title: Int J Game Theory
  doi: 10.1007/s00182-006-0058-x
– volume: 51
  start-page: 433
  year: 2006
  ident: 415_CR17
  publication-title: Comp Indus Eng
  doi: 10.1016/j.cie.2006.08.006
– volume: 17
  start-page: 705
  issue: 6
  year: 2011
  ident: 415_CR52
  publication-title: J Heuristics
  doi: 10.1007/s10732-010-9152-0
– volume: 107
  start-page: 431
  year: 1998
  ident: 415_CR47
  publication-title: Euro J Oper Res
  doi: 10.1016/S0377-2217(97)00348-2
– volume: 8
  start-page: 711
  year: 1980
  ident: 415_CR43
  publication-title: J Oper Res Soc
– ident: 415_CR25
  doi: 10.1145/1460299.1460318
– volume: 54
  start-page: 614
  year: 2003
  ident: 415_CR1
  publication-title: J Oper Res Soc
  doi: 10.1057/palgrave.jors.2601563
– volume: 6
  start-page: 132
  issue: 2
  year: 1999
  ident: 415_CR15
  publication-title: Int J Indus Eng Theory
– volume: 16
  start-page: 91
  year: 2009
  ident: 415_CR38
  publication-title: Scientia Iranica
– volume: 41
  start-page: 1693
  year: 1995
  ident: 415_CR31
  publication-title: Manag Sci
  doi: 10.1287/mnsc.41.10.1693
– volume: 4
  start-page: 369
  year: 1984
  ident: 415_CR44
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(84)90022-6
– volume: 36
  start-page: 2653
  year: 2009
  ident: 415_CR12
  publication-title: Comp Oper Res
  doi: 10.1016/j.cor.2008.11.010
– volume: 14
  start-page: 64
  issue: 2
  year: 1973
  ident: 415_CR42
  publication-title: Produc Invent Manag
– volume: 164
  start-page: 639
  year: 2005
  ident: 415_CR33
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2003.10.053
– start-page: 347
  volume-title: Math and Thompson
  year: 1963
  ident: 415_CR24
– volume: 29
  start-page: 987
  year: 1997
  ident: 415_CR28
  publication-title: IIE Trans
– volume: 208
  start-page: 177
  year: 2011
  ident: 415_CR55
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2010.03.037
– volume: 21
  start-page: 93
  year: 2006
  ident: 415_CR56
  publication-title: Comp Aided Civil Infrastruct Eng
  doi: 10.1111/j.1467-8667.2005.00420.x
– volume: 35
  start-page: 791
  year: 2007
  ident: 415_CR8
  publication-title: Oper Res Lett
  doi: 10.1016/j.orl.2007.01.003
– volume: 181
  start-page: 86
  year: 2007
  ident: 415_CR40
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2006.03.056
– volume: 29
  start-page: 44
  year: 1999
  ident: 415_CR35
  publication-title: IEEE Trans Syst
– volume: 109
  start-page: 159
  year: 2002
  ident: 415_CR3
  publication-title: Ann Oper Res
  doi: 10.1023/A:1016300218643
– volume: 201
  start-page: 409
  year: 2010
  ident: 415_CR51
  publication-title: Euro J Oper Res
  doi: 10.1016/j.ejor.2009.03.034
– volume: 31
  start-page: 2547
  year: 1993
  ident: 415_CR4
  publication-title: Int J Prod Res
  doi: 10.1080/00207549308956882
– volume: 28
  start-page: 1197
  issue: 10
  year: 1982
  ident: 415_CR50
  publication-title: Manag Sci
  doi: 10.1287/mnsc.28.10.1197
– ident: 415_CR7
– volume: 1
  start-page: 57
  issue: 2
  year: 1980
  ident: 415_CR2
  publication-title: J Oper Manag
  doi: 10.1016/0272-6963(80)90013-3
SSID ssj0067630
Score 2.2463164
Snippet This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total...
SourceID proquest
crossref
springer
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 49
SubjectTerms Algorithms
Business and Management
Design of experiments
Economic Theory/Quantitative Economics/Mathematical Methods
Economics
Finance
Heuristic methods
Industrial and Production Engineering
Insurance
Management
Material requirements planning
Mathematical models
Nonrenewable resources
Operations Research/Decision Theory
Optimization
Original Paper
Policies
Production scheduling
Project management
Resource scheduling
Statistics for Business
Taguchi methods
Title Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies
URI https://link.springer.com/article/10.1007/s11750-016-0415-2
https://www.proquest.com/docview/1880744818
Volume 25
WOSCitedRecordID wos000398727600006&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVAVX
  databaseName: SpringerLINK Contemporary 1997-Present
  customDbUrl:
  eissn: 1863-8279
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0067630
  issn: 1134-5764
  databaseCode: RSV
  dateStart: 19970101
  isFulltext: true
  titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22
  providerName: Springer Nature
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1bS8MwFA4yBfXBy1ScTsmDT0ogbZO2eRRx-OIQb-ytNEkLgmyj7QTf_A_-Q3-JOVmyqaigz0lDmsu55JzvfAgdGQtaKcpLooRKCBMyIHnJY1LqOJFxESipqSWbSPr9dDAQVw7HXftsdx-StJJ6DnYzmg6SqIwHbLQOMXJ30Wi7FPgarm_uvfiNzYWxKMggYsQY08yHMr8b4rMymluYX4KiVtf01v81yw205kxLfDo9C5tooRi20bJHHtdttHo5q9Fab6Gxxd4SoMLBlXvEJwrMRWCNKDR2jzTY-L9GHwFsHTv6GQyvt9gMZI8vtuU7oRkAaRWWo-Gkfnt5HRdmOs0zBh4II0HqbXTXO789uyCOf4GoKKUNCUrFU1GqkGoIn6UsLEVSclpEsdRhzhKZQNSN55FiuY5ozrhmmos0D3SohYx2UGs4Gha7CKexpLyQSkkAPag4N56m5CwMorgURq50EPUbkSlXnBz-9jGbl1WGhc0gIQ0WNgs76Hj2yXhameO3zl2_u5m7pHUGpegS454GaQed-N380PzTYHt_6r2PVkIwBWy2Txe1mmpSHKAl9dQ81NWhPbvvkWjqxg
linkProvider Springer Nature
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LS8QwEB5EBfXgW1yfOXhSAn0kfRxFXBTXRXSVvZUmaUGQ7rKtgjf_g__QX-JMbF0VFfScNKSZyTwy880A7KEFrbUjc65jHXIRK5enuQx4boJQBZmrlXFss4mw2436_fiixnGXTbZ7E5K0knoMdkNNR0lU6AGj1uEod6cEKiwqmH95ddOI3wAvjEVBur7gaEyLJpT53RKfldHYwvwSFLW6pr3wr10uwnxtWrLDN15YgomsWIaZBnlcLsPc-XuN1nIFhhZ7y6kVDhvVj_hck7lIXSMyw-pHGob-L-ojgq2zuv0Mo9dbhgtZ9mW2fCcNEyBtxNSguC9fnp6HGW6nemTUBwIlSLkK1-3j3tEJr_svcO1HTsXdXMsozrXnGAqfRcLL4zCXTuYHynipCFVIUTeZ-lqkxndSIY0wMo5S13gmVv4aTBaDIlsHFgXKkZnSWhHoQQcpeppKIvn8II9RrrTAaQiR6Lo4Of3tXTIuq0wHm1BCGh1s4rVg__2T4Vtljt8mbzXUTepLWiZUii5E99SNWnDQUPPD8E-Lbfxp9i7MnPTOO0nntHu2CbMemQU282cLJqvRfbYN0_qhui1HO5aPXwGaru2q
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1JSwMxFH5IFZeDS1WsVs3BkxI6SzLLUdSiqKXgQm_DJJmAINPSmQre_A_-Q3-JedOZVkUF8ZxMyGR5S9773gdwYCxoKS2uqQylT1kobBpr7lGtPF94iS2FsgqyCb_TCXq9sFvynGZVtnsVkhxjGrBKU5q3Bkq3psA3o_Uwocp4w0YDUSODZxnm0aO7fnNfiWLPXJ4CEWm7jBrDmlVhze-G-KyYptbmlwBpoXfaK_-e8SoslyYnOR6fkTWYSdI6LFSI5KwOS9eT2q3ZOgwKTC5FihwyLB_3qUQzEtkkEkXKxxti_GKjpxDOTkpaGoKvusQMVBxrUpT1xGYEqg2J6Kej7O3ldZCY6eTPBPkhjGTJNuCufXZ7ck5LXgYq3cDKqa0lD0ItHUthWC1gjg59za3E9YRyYuYLH6NxPHYli5VrxYwrpngYxLZyVCjcTail_TTZAhJ4wuKJkFIgGEJ6sfFABWeO7Xo6NPKmAVa1KZEsi5bj3z5G03LLuLARJqrhwkZOAw4nnwzGFTt-69ysdjoqL28WYYk637itdtCAo2pnPzT_NNj2n3rvw3z3tB1dXXQud2DRQWuhSAhqQi0fjpJdmJNP-UM23CuO9DsxePaO
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Multi-mode+resource-constrained+project+scheduling+problem+with+material+ordering+under+bonus%E2%80%93penalty+policies&rft.jtitle=TOP&rft.au=Zoraghi%2C+Nima&rft.au=Shahsavar%2C+Aria&rft.au=Abbasi%2C+Babak&rft.au=Vincent+Van+Peteghem&rft.date=2017-04-01&rft.pub=Springer+Nature+B.V&rft.issn=1134-5764&rft.eissn=1863-8279&rft.volume=25&rft.issue=1&rft.spage=49&rft.epage=79&rft_id=info:doi/10.1007%2Fs11750-016-0415-2&rft.externalDBID=NO_FULL_TEXT
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1134-5764&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1134-5764&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1134-5764&client=summon