A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning
This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this...
Uložené v:
| Vydané v: | International journal of production research Ročník 51; číslo 3; s. 847 - 868 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
London
Taylor & Francis Group
01.02.2013
Taylor & Francis LLC |
| Predmet: | |
| ISSN: | 0020-7543, 1366-588X |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Shrnutí: | This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this problem, we develop a branch and bound (B&B) algorithm (hereafter called the B&BA). Several lower bounds, dominance rules and upper bounds are developed to enhance the performance of the B&BA. Extensive computational experiments on randomly generated problems with different configurations are conducted and the results show that the proposed method can find optimal solutions for problems with up to 18 jobs in a reasonable amount of computation time. |
|---|---|
| Bibliografia: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-2 content type line 23 |
| ISSN: | 0020-7543 1366-588X |
| DOI: | 10.1080/00207543.2012.676683 |