Fuzzy Byproduct Gas Scheduling in the Steel Plant Considering Uncertainty and Risk Analysis

In the iron and steel enterprises, efficient utilization of byproduct gas is of great significance for energy conservation and emission reduction. This work presents a fuzzy optimal scheduling model for byproduct gas system. Compared with previous work, uncertainties in byproduct gas systems are tak...

Full description

Saved in:
Bibliographic Details
Published in:Energies (Basel) Vol. 11; no. 10; p. 2727
Main Authors: Sun, Xueying, Wang, Zhuo, Hu, Jingtao
Format: Journal Article
Language:English
Published: Basel MDPI AG 01.10.2018
Subjects:
ISSN:1996-1073, 1996-1073
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In the iron and steel enterprises, efficient utilization of byproduct gas is of great significance for energy conservation and emission reduction. This work presents a fuzzy optimal scheduling model for byproduct gas system. Compared with previous work, uncertainties in byproduct gas systems are taken into consideration. In our model, uncertain factors in byproduct systems are described by fuzzy variables and gasholder level constraints are formulated as fuzzy chance constraints. The economy and reliability of byproduct gas system scheduling are sensitive to different confidence levels. To provide a reference for operators to determine a proper confidence level, the risk cost is defined to quantify the risk of byproduct gas shortage and emission during the scheduling process. The best confidence level is determined through the trade-off between operation cost and risk cost. The experiment results demonstrated that the proposed method can reduce the risk and give a more reasonable optimal scheduling scheme compared with deterministic optimal scheduling.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:1996-1073
1996-1073
DOI:10.3390/en11102727