A method to construct a main hole structural plane model based on advanced parallel adit geological body

The advanced parallel adit of tunnel refers to the adit parallel to the direction of the main hole. Generally it is spaced tens of meters from the axis of the positive hole. During the tunnel construction, the parallel adit is driven before the main hole. Main function of it is to provide geological...

Full description

Saved in:
Bibliographic Details
Published in:IOP conference series. Earth and environmental science Vol. 1337; no. 1; pp. 12033 - 12041
Main Authors: Zhang, Shuainan, Wu, Wei, Zhang, Min, Huang, Yong, Fu, Wei
Format: Journal Article
Language:English
Published: Bristol IOP Publishing 01.05.2024
Subjects:
ISSN:1755-1307, 1755-1315
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first