A method to construct a main hole structural plane model based on advanced parallel adit geological body
The advanced parallel adit of tunnel refers to the adit parallel to the direction of the main hole. Generally it is spaced tens of meters from the axis of the positive hole. During the tunnel construction, the parallel adit is driven before the main hole. Main function of it is to provide geological...
Saved in:
| Published in: | IOP conference series. Earth and environmental science Vol. 1337; no. 1; pp. 12033 - 12041 |
|---|---|
| Main Authors: | , , , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
Bristol
IOP Publishing
01.05.2024
|
| Subjects: | |
| ISSN: | 1755-1307, 1755-1315 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!