A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold

Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on cybernetics Jg. 49; H. 3; S. 1097 - 1109
Hauptverfasser: Lei, Deming, Li, Ming, Wang, Ling
Format: Journal Article
Sprache:Englisch
Veröffentlicht: United States IEEE 01.03.2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Schlagworte:
ISSN:2168-2267, 2168-2275, 2168-2275
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!