A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold

Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on cybernetics Vol. 49; no. 3; pp. 1097 - 1109
Main Authors: Lei, Deming, Li, Ming, Wang, Ling
Format: Journal Article
Language:English
Published: United States IEEE 01.03.2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Subjects:
ISSN:2168-2267, 2168-2275, 2168-2275
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first