A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold
Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given...
Saved in:
| Published in: | IEEE transactions on cybernetics Vol. 49; no. 3; pp. 1097 - 1109 |
|---|---|
| Main Authors: | , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
United States
IEEE
01.03.2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Subjects: | |
| ISSN: | 2168-2267, 2168-2275, 2168-2275 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!