A Note on a Fully Polynomial-Time Approximation Scheme for Minimizing Makespan of Deteriorating Jobs
In (1998), Kovalyov and Kubiak studied the problem of scheduling n deteriorating jobs on a single machine to minimize makespan. They presented a fully polynomial-time approximation scheme which is based on a dynamic programming. Unfortunately, their dynamic programming is incorrect. So the fully pol...
Gespeichert in:
| Veröffentlicht in: | Mathematical problems in engineering Jg. 2013; H. 2013; S. 1 - 7 |
|---|---|
| 1. Verfasser: | |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Cairo, Egypt
Hindawi Publishing Corporation
01.01.2013
John Wiley & Sons, Inc |
| Schlagworte: | |
| ISSN: | 1024-123X, 1563-5147 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | In (1998), Kovalyov and Kubiak studied the problem of scheduling n deteriorating jobs on a single machine to minimize makespan. They presented a fully polynomial-time approximation scheme which is based on a dynamic programming. Unfortunately, their dynamic programming is incorrect. So the fully polynomial-time approximation scheme is also invalid. In this paper, we construct an instance to show how their dynamic programming does not work and provide a correct dynamic programming, based on which a new fully polynomial-time approximation scheme is derived. |
|---|---|
| Bibliographie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 ObjectType-Article-2 ObjectType-Feature-1 content type line 23 |
| ISSN: | 1024-123X 1563-5147 |
| DOI: | 10.1155/2013/957494 |