A Note on a Fully Polynomial-Time Approximation Scheme for Minimizing Makespan of Deteriorating Jobs
In (1998), Kovalyov and Kubiak studied the problem of scheduling n deteriorating jobs on a single machine to minimize makespan. They presented a fully polynomial-time approximation scheme which is based on a dynamic programming. Unfortunately, their dynamic programming is incorrect. So the fully pol...
Uloženo v:
| Vydáno v: | Mathematical problems in engineering Ročník 2013; číslo 2013; s. 1 - 7 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Cairo, Egypt
Hindawi Publishing Corporation
01.01.2013
John Wiley & Sons, Inc |
| Témata: | |
| ISSN: | 1024-123X, 1563-5147 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In (1998), Kovalyov and Kubiak studied the problem of scheduling n deteriorating jobs on a single machine to minimize makespan. They presented a fully polynomial-time approximation scheme which is based on a dynamic programming. Unfortunately, their dynamic programming is incorrect. So the fully polynomial-time approximation scheme is also invalid. In this paper, we construct an instance to show how their dynamic programming does not work and provide a correct dynamic programming, based on which a new fully polynomial-time approximation scheme is derived. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 ObjectType-Article-2 ObjectType-Feature-1 content type line 23 |
| ISSN: | 1024-123X 1563-5147 |
| DOI: | 10.1155/2013/957494 |