Citace podle APA (7th ed.)

Fereshtehnejad, E., & Shafieezadeh, A. (2018). A multi-type multi-occurrence hazard lifecycle cost analysis framework for infrastructure management decision making. Engineering structures, 167, 504-517. https://doi.org/10.1016/j.engstruct.2018.04.049

Citace podle Chicago (17th ed.)

Fereshtehnejad, Ehsan, a Abdollah Shafieezadeh. "A Multi-type Multi-occurrence Hazard Lifecycle Cost Analysis Framework for Infrastructure Management Decision Making." Engineering Structures 167 (2018): 504-517. https://doi.org/10.1016/j.engstruct.2018.04.049.

Citace podle MLA (9th ed.)

Fereshtehnejad, Ehsan, a Abdollah Shafieezadeh. "A Multi-type Multi-occurrence Hazard Lifecycle Cost Analysis Framework for Infrastructure Management Decision Making." Engineering Structures, vol. 167, 2018, pp. 504-517, https://doi.org/10.1016/j.engstruct.2018.04.049.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..