Citáce podľa APA (7th ed.)

Fereshtehnejad, E., & Shafieezadeh, A. (2018). A multi-type multi-occurrence hazard lifecycle cost analysis framework for infrastructure management decision making. Engineering structures, 167, 504-517. https://doi.org/10.1016/j.engstruct.2018.04.049

Citácia podle Chicago (17th ed.)

Fereshtehnejad, Ehsan, a Abdollah Shafieezadeh. "A Multi-type Multi-occurrence Hazard Lifecycle Cost Analysis Framework for Infrastructure Management Decision Making." Engineering Structures 167 (2018): 504-517. https://doi.org/10.1016/j.engstruct.2018.04.049.

Citácia podľa MLA (8th ed.)

Fereshtehnejad, Ehsan, a Abdollah Shafieezadeh. "A Multi-type Multi-occurrence Hazard Lifecycle Cost Analysis Framework for Infrastructure Management Decision Making." Engineering Structures, vol. 167, 2018, pp. 504-517, https://doi.org/10.1016/j.engstruct.2018.04.049.

Upozornenie: Tieto citáce sú generované automaticky. Nemusia byť úplne správne podľa citačných pravidiel..