A novel multi-objective discrete water wave optimization for solving multi-objective blocking flow-shop scheduling problem

The blocking flow-shop scheduling problem (BFSP) has been aroused general attention due to its broad industrial applications. However, most researches about it mainly focus on optimization of single objective. Multiple objectives are less considered simultaneously. Actually, in the practical product...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Knowledge-based systems Jg. 165; S. 110 - 131
Hauptverfasser: Shao, Zhongshi, Pi, Dechang, Shao, Weishi
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Amsterdam Elsevier B.V 01.02.2019
Elsevier Science Ltd
Schlagworte:
ISSN:0950-7051, 1872-7409
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The blocking flow-shop scheduling problem (BFSP) has been aroused general attention due to its broad industrial applications. However, most researches about it mainly focus on optimization of single objective. Multiple objectives are less considered simultaneously. Actually, in the practical production, the consideration of multiple objectives simultaneously could give more realistic solutions to the decision maker. Therefore, in this paper, we propose a novel multi-objective discrete water wave optimization (MODWWO) algorithm to solve a multi-objective BFSP (MOBFSP) that minimizes both makespan and total flow time. In the proposed algorithm, a decomposition-based initialization strategy is developed to generate a population with high quality and diversity. Then, a ranking-based propagation operator is designed to guide the global exploration and local exploitation of algorithm. Afterwards, a local intensification-based breaking operator is applied to improve the quality of the new created waves. Furthermore, a problem-specific refraction operator is incorporated to avoid being trapped in local optimum. The proposed algorithm is evaluated based on the benchmark instances, and compared with several state-of-the-art multi-objective scheduling optimization approaches. The comparison results show that the proposed MODWWO is a high-performing method for the considered MOBFSP. •Propose a multi-objective discrete WWO for MOBFSP.•Minimize the makespan and the total flowtime simultaneously.•Each operator of WWO is newly customized according to the features of problem.•Effectiveness of the proposed algorithm is demonstrated by numerical experiments and comparisons.
Bibliographie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0950-7051
1872-7409
DOI:10.1016/j.knosys.2018.11.021