Minimizing makespan in a group shop with fuzzy release dates and processing times

This paper deals with a fuzzy group shop scheduling problem. The group shop scheduling problem is a general formulation that includes the flow shop, the job shop, and the open shop scheduling problems. Job release dates and processing times are considered to be triangular fuzzy numbers. The objectiv...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of advanced manufacturing technology Jg. 66; H. 9-12; S. 2063 - 2074
Hauptverfasser: Ahmadizar, Fardin, Zarei, Alireza
Format: Journal Article
Sprache:Englisch
Veröffentlicht: London Springer-Verlag 01.06.2013
Springer Nature B.V
Schlagworte:
ISSN:0268-3768, 1433-3015
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper deals with a fuzzy group shop scheduling problem. The group shop scheduling problem is a general formulation that includes the flow shop, the job shop, and the open shop scheduling problems. Job release dates and processing times are considered to be triangular fuzzy numbers. The objective is to find a job schedule that minimizes the maximum completion time or makespan. First, the problem is formulated in a form of fuzzy programming and then prepared in a form of deterministic mixed binary integer linear programming by applying the chance-constrained programming. To solve the problem, an efficient genetic algorithm hybridized with an improvement procedure is developed. Both Lamarckian and Baldwinian versions are then implemented and evaluated through computational experiments.
Bibliographie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0268-3768
1433-3015
DOI:10.1007/s00170-012-4482-8