Minimizing makespan in a group shop with fuzzy release dates and processing times

This paper deals with a fuzzy group shop scheduling problem. The group shop scheduling problem is a general formulation that includes the flow shop, the job shop, and the open shop scheduling problems. Job release dates and processing times are considered to be triangular fuzzy numbers. The objectiv...

Full description

Saved in:
Bibliographic Details
Published in:International journal of advanced manufacturing technology Vol. 66; no. 9-12; pp. 2063 - 2074
Main Authors: Ahmadizar, Fardin, Zarei, Alireza
Format: Journal Article
Language:English
Published: London Springer-Verlag 01.06.2013
Springer Nature B.V
Subjects:
ISSN:0268-3768, 1433-3015
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first