Space resource allocation of dry bulk terminal yard based on logic-based Benders decomposition algorithm
This paper investigates the dual-objective space resource allocation problem for a dry bulk port yard responsible for both imports and exports. The study considers factors such as order operation time, operation sequencing, machine scheduling, and space allocation within the yard during the planning...
Saved in:
| Published in: | Ocean engineering Vol. 324; p. 120543 |
|---|---|
| Main Authors: | , , , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
Elsevier Ltd
30.04.2025
|
| Subjects: | |
| ISSN: | 0029-8018 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | This paper investigates the dual-objective space resource allocation problem for a dry bulk port yard responsible for both imports and exports. The study considers factors such as order operation time, operation sequencing, machine scheduling, and space allocation within the yard during the planning period. The dual-objective are minimizing order delay time and reducing the space configuration cost of the storage yard, which includes stacker-reclaimer movement costs, material mixing costs, and relocation costs. To effectively address this problem, a logic-based Benders decomposition algorithm is proposed. This approach decomposes the model into two sub-models based on the storage yard's operational process: task-machine-material pad and material pad-material slot. The primary model determines task scheduling, machine assignments, and a rough material layout, while the secondary model refines the material layout based on the output of the primary model. Extensive case studies demonstrate that the proposed logic-based Benders decomposition algorithm generally outperforms the Non-dominated Sorting Genetic Algorithm II (NSGA-II) algorithm in terms of solution quality, and both of them can solve the result in a short time.
•This paper considers the dual-objective parallel machine scheduling and job assignment problem in a complex terminal yard.•The problem is transformed into a two-objective integer nonlinear programming model with multiple costs.•In this paper, a logic-based Benders decomposition algorithm is proposed, and a new method for obtaining a tight lower bound is proposed. |
|---|---|
| ISSN: | 0029-8018 |
| DOI: | 10.1016/j.oceaneng.2025.120543 |