Multi-objective modeling and optimization for scheduling of cracking furnace systems
Cracking furnace is the core device for ethylene production. In practice, multiple ethylene furnaces are usually run in parallel. The scheduling of the entire cracking furnace system has great significance when multiple feeds are simultaneously processed in multiple cracking furnaces with the changi...
Uložené v:
| Vydané v: | Chinese journal of chemical engineering Ročník 25; číslo 8; s. 992 - 999 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Elsevier B.V
01.08.2017
|
| Predmet: | |
| ISSN: | 1004-9541, 2210-321X |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!