Optimizing distributed reentrant heterogeneous hybrid flowshop batch scheduling problem: Iterative construction-local search-reconstruction algorithm

•A MILP model for the DRHHFBSP is developed.•A construction heuristic capable of generating excellent solutions is developed.•An iterative construction-local search-reconstruction algorithm is designed. In recent years, the distributed hybrid flowshop scheduling problem (DHFSP) has garnered widespre...

Full description

Saved in:
Bibliographic Details
Published in:Swarm and evolutionary computation Vol. 90; p. 101681
Main Authors: He, Peng, Zhang, Biao, Lu, Chao, Meng, Lei-lei, Zou, Wen-qiang
Format: Journal Article
Language:English
Published: Elsevier B.V 01.10.2024
Subjects:
ISSN:2210-6502
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first