Heuristic Scheduling of Batch Production Processes Based on Petri Nets and Iterated Greedy Algorithms
Wire rod and bar rolling is an important batch production process in steel production systems. A scheduling problem originated from this process is studied in this work by considering the constraints on sequence-dependent family setup time and release time. For each serial batch to be scheduled, it...
Saved in:
| Published in: | IEEE transactions on automation science and engineering Vol. 19; no. 1; pp. 251 - 261 |
|---|---|
| Main Authors: | , , , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
New York
IEEE
01.01.2022
The Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Subjects: | |
| ISSN: | 1545-5955, 1558-3783 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | Wire rod and bar rolling is an important batch production process in steel production systems. A scheduling problem originated from this process is studied in this work by considering the constraints on sequence-dependent family setup time and release time. For each serial batch to be scheduled, it contains several jobs and the number of late jobs within it varies with its start time. First, we model a rolling process using a Petri net (PN), where a so-called rolling transition describes a rolling operation of a batch. The objective of the concerned problem is to determine a firing sequence of all rolling transitions such that the total number of late jobs is minimal. Next, a mixed-integer linear program is formulated based on the PN model. Due to the NP-hardness of the concerned problem, iterated greedy algorithm (IGA)-based methods by using different neighborhood structures and integrating a variable neighborhood descent method are developed to obtain its near-optimal solutions. To test the accuracy, speed, and stability of the proposed algorithms, we compare their solutions of different-size instances with those of CPLEX (a commercial software) and four heuristic peers. The results indicate that the proposed algorithms outperform their peers and have great potential to be applied to industrial production process scheduling. Note to Practitioners -This work deals with a scheduling problem of a batch production process, i.e., wire rod and bar rolling, which is modeled by a Petri net (PN). Due to the NP-hardness of the concerned problem, four iterated greedy algorithm-based methods are developed to solve it. The proposed methods are validated and tested by comparing their solutions with those of four heuristic peers and the exact ones (when available via CPLEX). Extensive experimental results show that they can fast solve one-week-scale instances with better performance than their peers', thereby proving the readiness to put them in industrial use. When solving a one-month-scale instance, the proposed methods show much better performance than others. |
|---|---|
| Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 1545-5955 1558-3783 |
| DOI: | 10.1109/TASE.2020.3027532 |