A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precede...
Saved in:
| Published in: | Soft computing (Berlin, Germany) Vol. 25; no. 22; pp. 14315 - 14331 |
|---|---|
| Main Author: | |
| Format: | Journal Article |
| Language: | English |
| Published: |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.11.2021
|
| Subjects: | |
| ISSN: | 1432-7643, 1433-7479 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precedence and resource constraints. The proposed branch-and-bound can be employed to obtain optimal solutions and also can be truncated in order to find promising near optimal solutions. The depth-first strategy is utilized for constructing the search tree, and earliest start time (EST) concept is adopted for selecting a node for further branching while traversing the tree down to the leaves. The performance of developed branch-and-bound is benchmarked against CPLEX and SADESP across an extensive set of 960 problems. The results returned by the proposed algorithm show experimentally its effectiveness to solve the FS-RCPSP. |
|---|---|
| ISSN: | 1432-7643 1433-7479 |
| DOI: | 10.1007/s00500-021-06147-9 |