A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem

In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precede...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Soft computing (Berlin, Germany) Jg. 25; H. 22; S. 14315 - 14331
1. Verfasser: Alipouri, Yaghoub
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Berlin/Heidelberg Springer Berlin Heidelberg 01.11.2021
Schlagworte:
ISSN:1432-7643, 1433-7479
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precedence and resource constraints. The proposed branch-and-bound can be employed to obtain optimal solutions and also can be truncated in order to find promising near optimal solutions. The depth-first strategy is utilized for constructing the search tree, and earliest start time (EST) concept is adopted for selecting a node for further branching while traversing the tree down to the leaves. The performance of developed branch-and-bound is benchmarked against CPLEX and SADESP across an extensive set of 960 problems. The results returned by the proposed algorithm show experimentally its effectiveness to solve the FS-RCPSP.
ISSN:1432-7643
1433-7479
DOI:10.1007/s00500-021-06147-9